Roads23PL0124

CONCRETING OF BARANGAY LOWER TALOCTOC FMR, BARANGAY LOWER TALOCTOC, TANUDAN, KALINGA

CONCRETING OF BARANGAY LOWER TALOCTOC FMR, BARANGAY LOWER TALOCTOC, TANUDAN, KALINGA is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱11,929,822.48. Status: Past target date (DPWH On-Going). Contractor on record: JEP CONST. Figures trace to dpwh.

Lower Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23PL0124 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    95% reported · imagery 2023-08-10 → 2023-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BARANGAY LOWER TALOCTOC FMR, BARANGAY LOWER TALOCTOC, TANUDAN, KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Gatumay Dan Flood Control at Barangay Cabaruan, Tabuk City, Kalinga
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Lower Kalinga DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

66 projects · ₱854.7M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT- PAVING OF UNPAVED ROADS-TERTIARY ROADS MT. PROVINCE - ISABELA RD CHAINAGE 21883-CHAINAGE 24699, CHAINAGE 24699-CHAINAGE 25863

Cordillera Administrative Region, Cordillera Administrative Region

2018₱131.0M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) JCT. TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD ROAD, CHAINAGE 458 - CHAINAGE 2720, CHAINAGE 2940

Cordillera Administrative Region, Cordillera Administrative Region

2017₱126.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FOUR(4) STOREY EIGHT(8) CLASSROOM WORKSHOP SCHOOL BUILDING 2, TABUK CITY NATIONAL HIGH SCHOOL, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2018₱37.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS MT. PROVINCE BDRY-CALANAN-PINUKPUK-ABBUT ROAD - K04

Upper Kalinga DEO, Cordillera Administrative Region

2021₱37.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF NAMBUCAYAN HIGHSCHOOL FLOOD CONTROL ALONG MANANIG RIVER

Lower Kalinga DEO, Cordillera Administrative Region

2024₱35.1M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE CANAL ALONG MT. PROVINCE BDRY. - CALANAN - PINUKPUK - ABBUT ROAD, CALANA

Lower Kalinga DEO, Cordillera Administrative Region

2024₱34.3M
Past target date (DPWH On-Going)
View all 66 projects →

4. Implementation

Contract Amount

₱11,929,822.48

Progress

Past target date (DPWH On-Going)

Start Date

November 21, 2023

Target End

May 13, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaTanudanLower Taloctoc
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultLandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.