Water Provision and Storage23IL0062

CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BONTOC, SOUTHERN LEYTE

CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BONTOC, SOUTHERN LEYTE is a DPWH-tracked public work in Southern Leyte 1st DEO, Region VIII. Reported contract value: ₱9,790,516.70. Status: Reported complete (DPWH). Contractor on record: 3MC KING CIVIL ENGINEERING CONST. Figures trace to dpwh.

Southern Leyte 1st DEO, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱9,787,349 · ON POINT CONSTRUCTION AND DEVELOPMENT

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-11-07 → 2025-09-30

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BONTOC, SOUTHERN LEYTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Canturing Flood Structures, Canturing River, Maasin City, Southern Leyte
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Southern Leyte 1st DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

23IL0062 CONSTRUCTION / REHABILITATION OF WATER SU

₱9,787,349.25 · ON POINT CONSTRUCTION AND DEVELOPMENT

Contractor

B

23 projects · ₱252.4M total · 1 flags

Other projects by this contractor

No sat.

LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF CANIPAAN - TAWOG - MATIN-AO - CATUBLIAN ROAD, HINUNANGAN, SOUTHERN LEYTE

Southern Leyte 1st DEO, Region VIII

2021₱25.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO CRATER LAKE, BRGY. DAYAN

Southern Leyte 1st DEO, Region VIII

2022₱24.5M
Reported complete (DPWH)
No sat.

BRIDGE - WIDENING OF PERMANENT BRIDGES, HIMAY-ANGAN BRIDGE (B00614LT) ALONG DAANG MAHARLIKA (LT), LILOAN, SOUTHERN LEYTE

Southern Leyte 1st DEO, Region VIII

2022₱24.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING -SECONDARY ROADS, BDRY. SOUTHERN LEYTE-MAASIN-MACROHON-SOGOD-JCT. DAANG MAHARLIKA - K1146+287 - K1147+076, MACROHON, SOUTHERN LEYTE

Southern Leyte 1st DEO, Region VIII

2023₱19.6M
Reported complete (DPWH)
No sat.

BRIDGES - RETROFITTING/STRENGTHENING OF PERMANENT WEAK BRIDGES NUEVA ESTRELLA BRIDGE (B00359LT) ALONG LILOAN-SAN RICARDO ROAD, PINTUYAN, SOUTHERN LEYTE

Southern Leyte 1st DEO, Region VIII

2022₱15.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF STO. NIÑO BRIDGE, STO. NIÑO, MAASIN CITY, SOUTHERN

Southern Leyte 1st DEO, Region VIII

2025₱14.8M
Past target date (DPWH On-Going)
View all 23 projects →

4. Implementation

Contract Amount

₱9,790,516.70

Progress

Reported complete (DPWH)

Start Date

October 10, 2023

Target End

April 2, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BONTOC, SOUTHERN LEYTE.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/9f7a5557-cfab-4709-9dd5-f3ec04223064

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)Southern LeyteBontocTaytagan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.