Buildings and Facilities19GB0239

CLUSTER 3 - 3 (THREE) PROJECTS

CLUSTER 3 - 3 (THREE) PROJECTS is a DPWH-tracked public work in Antique DEO, Region VI. Reported contract value: ₱5,331,000.00. Status: Reported complete (DPWH). Contractor on record: PHILIPPINE CHEMSTEEL INDUSTRIES INC. Figures trace to dpwh.

Antique DEO, Region VI
Region: Region VI

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-CAR-19-0020109 · ₱1,221,679 · release to the district office, not itemized per project

    Possible match · score 0.74

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱5,331,000 · PHILIPPINE CHEMSTEEL INDUSTRIES INC

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-09-27 → 2025-08-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER 3 - 3 (THREE) PROJECTS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-CAR-19-0020109

₱1,221,679.00 · FY2019

Released to Balbalan Agricultural and Industrial S (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

19GB0239 - Cluster 3 – 3 (Three) Projects, Antique

₱5,331,000.00 · PHILIPPINE CHEMSTEEL INDUSTRIES INC

Award / contract ref: 19GB0239

Contractor

A

368 projects · ₱14.1B total · 0 flags

Other projects by this contractor

No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG AGOO-BAGUIO CITY ROAD K0237+700 - K0237+800, K0247+500 - K0247+600, K0251+050 - K0251+150, K0251+300 - K0251+400, K0252+350 - K0252+600, K02

Region I, Region I

2023₱241.2M
Reported complete (DPWH)
No sat.

ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - EXPANSION OF ACTIVE TRANSPORT INFRASTRUCTURE

National Capital Region, National Capital Region

2022₱195.6M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG PANGASINAN-NUEVA VIZCAYA ROAD, PACKAGE 1, PANGASINAN

Region I, Region I

2024₱193.0M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG A) URDANETA JCT-DAGUPAN RD- K0201+000-K0201+370, K0201+370-K0201+870, K0201+870-K0202+000, K0202+000-K0203+021, K0203+021-K0203+947, K0203+9

Region I, Region I

2023₱193.0M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG A) JUDGE JOSE DE VENECIA SR. AVE - K0207+(-711) - K0207+(-611), K0207+(-611) - K0207+000, K0207+000 - K0207+073, K0207+183 - K0207+374, K020

Region I, Region I

2023₱193.0M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG A) SN CARLOS-CALASIAO RD- K0211 + 000 - K0212 + 000, K0212 + 000 - K0212 + 471, K0212 + 560 - K0212 + 696, K0212 + 696 - K0212 + 775, K021

Region I, Region I

2023₱192.9M
Reported complete (DPWH)
View all 368 projects →

4. Implementation

Contract Amount

₱5,331,000.00

Progress

Reported complete (DPWH)

Start Date

October 11, 2019

Target End

April 4, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CLUSTER 3 - 3 (THREE) PROJECTS.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/a042747c-f684-4607-a17a-4cc453c7a33e

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)AntiquePandanDumrog
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.