Flood Control and Drainage16AB0083

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, DAMAGE FLOOD CONTROL FACILITIES/STRUCTURES UNDER THE LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT (LRBFCSP) ALONG SOLSONA RIVER, ERODED PORTION OF DIKES SLOPE AT RIGHT BANK

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, DAMAGE FLOOD CONTROL FACILITIES/STRUCTURES UNDER THE LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT (LRBFCSP) ALONG SOLSONA RIVER, ERODED PORTION OF DIKES SLOPE AT RIGHT BANK is a DPWH-tracked public work in Ilocos Norte 2nd DEO, Region I. Reported contract value: ₱19,599,999.90. Status: Reported complete (DPWH). Contractor on record: DJCM CONST CORP FORMERLY: DJCM CONST. Figures trace to dpwh.

Ilocos Norte 2nd DEO, Region I
Region: Region I

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Damaged Flood Control Facilities/Structures under the Laoag River Basin Flood Control and Sabo Project (LRBDCSP) along Solsona River, eroded portion of dike slope at riverside Left Bank and Right Bank
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-B-16-0038832

₱3,395,952.00 · FY2016

Released to Central Off (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱19,599,999.90

Progress

Reported complete (DPWH)

Start Date

March 29, 2016

Target End

September 4, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.