CONSTRUCTION OF BULI FLOOD CONTROL SYSTEM, BARANGAY BULI, ABRA
CONSTRUCTION OF BULI FLOOD CONTROL SYSTEM, BARANGAY BULI, ABRA is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱47,515,474.59. Status: Reported complete (DPWH). Contractor on record: VIKING CONST. Figures trace to dpwh.
DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.
No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.
Total Contract Cost