Buildings and Facilities20FO0101

CONSTRUCTION OF MULTI-PURPOSE BUILDING, ALBAY PROVINCIAL HOSPITAL, OUT PATIENT DEPT., LIGAO, ALBAY

CONSTRUCTION OF MULTI-PURPOSE BUILDING, ALBAY PROVINCIAL HOSPITAL, OUT PATIENT DEPT., LIGAO, ALBAY is a DPWH-tracked public work in Albay 3rd DEO, Region V. Reported contract value: ₱9,396,413.16. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: ADS CONST AND SUPPLY. Figures trace to dpwh.

Albay 3rd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱18,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20FO0101 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-01-08 → 2022-04-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING, ALBAY PROVINCIAL HOSPITAL, OUT PATIENT DEPT., LIGAO, ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱18,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Cabilogan River, Binatagan-Bobunsuran Section, Ligao, Albay
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Albay 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

13 projects · ₱288.2M total · 0 flags

Other projects by this contractor

No sat.

OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG NASISI RIVER, LIGAO CITY, ALBAY, STA. 4+

Region V, Region V

2019₱101.3M
Past target date (DPWH On-Going)
No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0538+550 - K0539+452

Albay 2nd DEO, Region V

2019₱28.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES: BRGY. 3-BRGY. 2-BRGY. 1 ROAD CONNECTING LIGAO-PIODURAN ROAD AND PIODURAN-DONSOL ROAD IN SUPPORT TO AGRIBUSINESS (FOOD RESOUR

Region V, Region V

2020₱24.1M
Reported complete (DPWH)
No sat.

CLUSTER 6: REPAIR/REHABILITATION/IMPROVEMENT OF (ASPHALT OVERLAY) ALONG A.) QUEZON AVE. WHARF RD. ELIZONDO ST. AND RIZAL ST., LEGAZPI, ALBAY B.) DAANG MAHARLIKA HIGHWAY JCT. LEGAZPI-STO.DOMINGO-CAMARINES SUR BDRY. ROAD K0536+585-K0539+054, LEGAZPI CITY

Albay 2nd DEO, Region V

2020₱19.2M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILTIES - CONSTRUCTION OF LINE CANAL ALONG PUROK 1, PAG-ASA DRIVE AND PUROK 2, 3 AND 4A, SAN JOSE ST., RAWIS, LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2022₱19.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION OF BOULDER DIKE ALONG TANDARORA RIVER, GUINOBATAN, ALBAY

Albay 3rd DEO, Region V

2020₱18.9M
Reported complete (DPWH)
View all 13 projects →

4. Implementation

Contract Amount

₱9,396,413.16

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

November 16, 2020

Target End

May 29, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of LigaoTuburan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.