Water Provision and Storage16JG0067

CONSTRUCTION OF RAINWATER COLLECTION SYSTEM FACILITIES (RWCSF) AT POBLACION SAN PABLO PUBLIC MARKET, POBLACION, SAN PABLO, ZAMBOANGA DEL SUR

CONSTRUCTION OF RAINWATER COLLECTION SYSTEM FACILITIES (RWCSF) AT POBLACION SAN PABLO PUBLIC MARKET, POBLACION, SAN PABLO, ZAMBOANGA DEL SUR is a DPWH-tracked public work in Zamboanga del Sur 2nd DEO, Region IX. Reported contract value: ₱191,949.64. Status: Reported complete (DPWH). Contractor on record: PINS CONST. Figures trace to dpwh.

Zamboanga del Sur 2nd DEO, Region IX
Region: Region IX

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-16-0001836 · ₱23,701 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16JG0067 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-04-20 → 2025-02-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF RAINWATER COLLECTION SYSTEM FACILITIES (RWCSF) AT POBLACION SAN PABLO PUBLIC MARKET, POBLACION, SAN PABLO, ZAMBOANGA DEL SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Extension of Flood Control Structure along Dipolog River, Guinles Section (Upstream), Polanco, Zamboanga del Norte
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-16-0001836

₱23,701.00 · FY2016

Released to Division of Eastern Samar (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

71 projects · ₱266.2M total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION-PREVENTIVE MAINTENANCE- TERTIARY ROADS ALONG JCT. DUMALINAO-MARGOSATUBIG ROAD SO1170MN K1693+091 - K1695+600, K1696+595 - K1696+973, DUMALINAO-MARGOSATUBIG ROAD, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2019₱25.9M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS ALONG ZAMBOANGA DEL SUR COASTAL ROAD SO1101MN CHAINAGE 240 - CHAINAGE 856, ZAMBOANGA DEL SUR COASTAL ROAD

Zamboanga del Sur 2nd DEO, Region IX

2019₱24.0M
Reported complete (DPWH)
No sat.

ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LAMOGONG ROAD, MANJUYOD, NEGROS ORIENTAL

Negros Oriental 1st DEO, Negros Island Region

2022₱19.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF TWO (2) STOREY - TEN (10 CLASSROOM SCHOOL BUILDING AT DIMATALING NATIONAL HIGH SCHOOL, DIMATALING, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2018₱18.6M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS ALONG PAGADIAN CITY-ZAMBOANGA CITY ROAD S01453MN K1704+794-K1704+890, K1704+962-K1705+070, K1705+070-K1705+137, K1705+137-K1705+35

Zamboanga del Sur 2nd DEO, Region IX

2019₱17.8M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM: EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES - CONSTRUCTION OF EVACUATION CENTERS / COVERED COURT, TRINIDAD, GUIHULNGAN CITY, NEGROS ORIENTAL

Negros Oriental 1st DEO, Negros Island Region

2023₱4.9M
Reported complete (DPWH)
View all 71 projects →

4. Implementation

Contract Amount

₱191,949.64

Progress

Reported complete (DPWH)

Start Date

October 17, 2016

Target End

October 29, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga del SurSan PabloPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.