Roads17N00062

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, SOCORRO PORT-JCT. SONGKOY - SUDLON-SOHOTON COVE, SIARGAO, SURIGAO DEL NORTE 1ST LD, SOCORRO, SIARGAO, SURIGAO DEL NORTE

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, SOCORRO PORT-JCT. SONGKOY - SUDLON-SOHOTON COVE, SIARGAO, SURIGAO DEL NORTE 1ST LD, SOCORRO, SIARGAO, SURIGAO DEL NORTE is a DPWH-tracked public work in Region XIII, Region XIII. Reported contract value: ₱94,827,497.34. Status: Reported complete (DPWH). Contractor on record: MAMSAR CONST AND INDUSTRIAL CORP. Figures trace to dpwh.

Region XIII, Region XIII
Region: Region XIII

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17N00062 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-08-06 → 2025-01-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, SOCORRO PORT-JCT. SONGKOY - SUDLON-SOHOTON COVE, SIARGAO, SURIGAO DEL NORTE 1ST LD, SOCORRO, SIARGAO, SURIGAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

124 projects · ₱7.4B total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG MAOYON RIVER, BRGY. MAOYON (LS), PTO. PRINCESA CITY, PALAWAN

Region IV-B, Region IV-B

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENAMNCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG MAOYON RIVER (RS), STA. 000+000-STA. 000+623.17, PTO. PRINCESA CITY, PALAWAN

Region IV-B, Region IV-B

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, DAPA PORT - CONSUELO - STA. CRUZ - STA. FE - LBERTAD - CABITOONAN - CATANGNA - GENERAL LUNA ROAD (INCL. BRIDGE COMPLETION OF CATANGNAN - CABITOONAN BRIDGE AND LIBERTAD BRIDGE 2), SURIGAO DEL N

Region XIII, Region XIII

2018₱193.0M
Reported complete (DPWH)
No sat.

DAPA PORT-CONSUELO-CORAZON-STA. CRUZ - STA. FE - CABITOONAN-CATANGNAN-GENERAL LUNA ROAD (CABITOONAN-CATANGNAN BRIDGE PHASE II), SURIGAO DEL NORTE 1ST LD., GENERAL LUNA, SURIGAO DEL NORTE, SIARGAO ISLANDS

Region XIII, Region XIII

2017₱193.0M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED), DINAGAT-LORETO ROAD, K0009+466-K0010+000, K0010+000-K0010+757, K0048+000-K0048+700, K0053+020-K0053+320, K0053+348-K0054+000-K0055+000, K0058+566-K0058+810, DINAGAT ISLANDS

Region XIII, Region XIII

2017₱161.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF EMBARKADERO FLOOD CONTROL STRUCTURE ALONG BAHAY RIVER, (DOWNSTREAM), PALO, LEYTE

Region VIII, Region VIII

2024₱159.6M
Past target date (DPWH On-Going)
View all 124 projects →

4. Implementation

Contract Amount

₱94,827,497.34

Progress

Reported complete (DPWH)

Start Date

May 23, 2017

Target End

August 30, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, SOCORRO PORT-JCT. SONGKOY - SUDLON-SOHOTON COVE, SIARGAO, SURIGAO DEL NORTE 1ST LD, SOCORRO, SIARGAO, SURIGAO DEL NORTE.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/a638ce8b-b5b9-4923-b1ae-fdd42de990e0

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Surigao del NorteSocorroSudlon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.