Buildings and Facilities19CI0166

COMPLETE CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING,CALAPI NEGRITO ELEMENTARY SCHOOL AT MABALACAT CITY,PAMPANGA

COMPLETE CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING,CALAPI NEGRITO ELEMENTARY SCHOOL AT MABALACAT CITY,PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱12,438,198.04. Status: Reported complete (DPWH). Contractor on record: 3-SIDES BUILDERS. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROXI-19-0017870 · ₱1,244,000 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19CI0166 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-08 → 2025-01-16

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: COMPLETE CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING,CALAPI NEGRITO ELEMENTARY SCHOOL AT MABALACAT CITY,PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-19-0017870

₱1,244,000.00 · FY2019

Released to Davao Region Centers for Health Development (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

42 projects · ₱631.2M total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES ALONG SAPANGBALEN RIVER, B

Pampanga 3rd DEO, Region III

2025₱47.9M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES ALONG SAPANGBALEN RIVER, BR

Pampanga 3rd DEO, Region III

2025₱47.9M
Ongoing (DPWH-reported)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, (DOWNSTREAM- LEFT BANK) BARANGAY CONSUELO, MACABEBE, PAMP

Pampanga 1st DEO, Region III

2025₱46.5M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, (DOWNSTREAM- RIGHT BANK) BARANGAY CONSUELO, MACABEBE, PAMP

Pampanga 1st DEO, Region III

2025₱46.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -LOCAL ROADS AND BRIDGES - LOCAL BRIDGES -CONSTRUCTION/REHABILITATION OF SAN JUAN BRIDGE ALONG OLD NATIONAL ROAD, SAMAL, BATAAN

Bataan 1st DEO, Region III

2021₱44.1M
Reported complete (DPWH)
No sat.

SIPAG-ACCESS ROADS AND/OR BRIDGE/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES- IMPROVEMENT/REHABILITATION OF PANDAN BRIDGE, ANGELES CITY

Pampanga 3rd DEO, Region III

2023₱37.2M
Reported complete (DPWH)
View all 42 projects →

4. Implementation

Contract Amount

₱12,438,198.04

Progress

Reported complete (DPWH)

Start Date

September 26, 2019

Target End

June 6, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaMabalacat CityMarcos Village
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.