CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS), RAPULI ES; CASAMBALANGAN ES; GONZAGA NHS; CASITAN ES, GONZAGA,CAG; CAROAN ES, GONZAGA, CAG; ALBA ES, BAGGAO, CAG; CASICALLAN ES, GATTARAN, CAG; CUMAO ES, GATTARAN, CAG; BANGALAO ES, SANTA TERESITA, CAG
CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM (RWCS), RAPULI ES; CASAMBALANGAN ES; GONZAGA NHS; CASITAN ES, GONZAGA,CAG; CAROAN ES, GONZAGA, CAG; ALBA ES, BAGGAO, CAG; CASICALLAN ES, GATTARAN, CAG; CUMAO ES, GATTARAN, CAG; BANGALAO ES, SANTA TERESITA, CAG is a DPWH-tracked public work in Cagayan 1st DEO, Region II. Reported contract value: ₱2,876,891.18. Status: Reported complete (DPWH). Contractor on record: FOUR M BUILDERS. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
