Buildings and Facilities17PB0081No coordinates published by DPWH

CY 2017 BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF CLASSROOMS BATCH 13, CONSTRUCTION OF 1STY - WORKSHOP BUILDING CONNER CENTAL NHS MAIN

CY 2017 BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF CLASSROOMS BATCH 13, CONSTRUCTION OF 1STY - WORKSHOP BUILDING CONNER CENTAL NHS MAIN is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱6,337,372.85. Status: Reported complete (DPWH). Contractor on record: ISAGA BUILDERS. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Cordillera Administrative Region

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0006775 · ₱318,930 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱6,157,410 · ISAGA BUILDERS

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CY 2017 BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF CLASSROOMS BATCH 13, CONSTRUCTION OF 1STY - WORKSHOP BUILDING CONNER CENTAL NHS MAIN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0006775

₱318,930.00 · FY2017

Released to MacArthur National S Agricultural School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Project

₱6,157,410.16 · ISAGA BUILDERS

Award / contract ref: 17PB0081

Contractor

B

22 projects · ₱142.6M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BARREN RIVER (UPSTREAM) FLOOD CONTROL, BRGY. TALIFUGO, CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2020₱19.0M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, APAYAO-ILOCOS NORTE RD - K0609+175 - K0609+206, K0611+015 - K0611+036, K0611+335 - K0611+359

Apayao 1st DEO, Cordillera Administrative Region

2023₱16.9M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, APAYAO-ILOCOS NORTE RD - K0613 + 012 - K0613 + 300

Apayao 1st DEO, Cordillera Administrative Region

2024₱14.3M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, APAYAO-ILOCOS NORTE RD - K0623 + 742 - K0623 + 962

Apayao 1st DEO, Cordillera Administrative Region

2024₱14.3M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, ABBUT-CONNER RD - K0553+041 - K0553+366, CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2022₱9.8M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, CONNER-KABUGAO RD - K0591 + 580 - K0591 + 620

Apayao 1st DEO, Cordillera Administrative Region

2024₱9.8M
Reported complete (DPWH)
View all 22 projects →

4. Implementation

Contract Amount

₱6,337,372.85

Progress

Reported complete (DPWH)

Start Date

January 2, 2018

Target End

August 1, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)ApayaoConner
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.