Roads24CN0147

CONSTRUCTION OF ROAD, BRGY. DIBACONG, CASIGURAN, AURORA

CONSTRUCTION OF ROAD, BRGY. DIBACONG, CASIGURAN, AURORA is a DPWH-tracked public work in Aurora DEO, Region III. Reported contract value: ₱4,860,455.90. Status: Past target date (DPWH On-Going). Contractor on record: RADIANCE TRADERS. Figures trace to dpwh.

Aurora DEO, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24CN0147 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    58% reported · imagery 2023-10-28 → 2023-10-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ROAD, BRGY. DIBACONG, CASIGURAN, AURORA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Brgy. Dibacong, Casiguran, Aurora
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Aurora DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

4. Implementation

Contract Amount

₱4,860,455.90

Progress

Past target date (DPWH On-Going)

Start Date

May 30, 2024

Target End

September 13, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF ROAD, BRGY. DIBACONG, CASIGURAN, AURORA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/ad122323-c34d-47ba-90b3-3991480ac8e5

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)AuroraCasiguranDibacong
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultFlood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.