Buildings and Facilities23PM0047

BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH I: CONSTRUCTION OF 3STY6CL, PARACELIS TECHNICAL AND VOCATIONAL HIGH SCHOOL, PARACELIS, MT. PROVINCE

BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH I: CONSTRUCTION OF 3STY6CL, PARACELIS TECHNICAL AND VOCATIONAL HIGH SCHOOL, PARACELIS, MT. PROVINCE is a DPWH-tracked public work in Mountain Province 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱16,210,000.00. Status: Reported complete (DPWH). Contractor on record: UPLAND CONST AND ENGINEERING SERVICES. Figures trace to dpwh.

Mountain Province 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23PM0047 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-29 → 2020-02-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH I: CONSTRUCTION OF 3STY6CL, PARACELIS TECHNICAL AND VOCATIONAL HIGH SCHOOL, PARACELIS, MT. PROVINCE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Mitigation Structure, Sao-Malitep along Chico River, Balili, Bontoc, Mountain Province
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Mountain Province 2nd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

63 projects · ₱1.4B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-CONSTRUCTION OF ROAD, PARACELIS ROXAS ROAD VIA (JCT. MABOLLOG-MABARUTBOT-CARUPAAN-TUPING-ANONAT PROPER SINAMAR SECTION), PARACELIS, MOUNTAIN PROVINCE

Mountain Province 2nd DEO, Cordillera Administrative Region

2025₱144.8M
Past target date (DPWH On-Going)

Construction of Buringal Proper Flood Control (Sulinek Section), Sta. 065+507 - Sta. 066+407 (Right Side), Buringal, Paracelis, Mountain Province

PARACELIS (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE, Cordillera Administrative Region

2024₱96.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ANONAT PROPER FLOOD CONTROL STRUCTURE (ILI SECTION), ST

Mountain Province 2nd DEO, Cordillera Administrative Region

2024₱96.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CASSAG-BACARRI-CAMPARADI-CAWAYAN-BURINGAL PROPER-SINAMAR ROAD LEADING TO SMO

Mountain Province 2nd DEO, Cordillera Administrative Region

2022₱96.5M
Reported complete (DPWH)
No sat.

Construction of Buringal Proper Flood Control, Sta. 065 + 267 - Sta. 065 + 867 (L.S.), Buringal, Paracelis, Mountain Province

PARACELIS (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE, Cordillera Administrative Region

2023₱67.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) JCT. NANSUSO-BACARRI-BANTAHS-MPSPC-TAWANG R

Mountain Province 2nd DEO, Cordillera Administrative Region

2024₱57.9M
Reported complete (DPWH)
View all 63 projects →

4. Implementation

Contract Amount

₱16,210,000.00

Progress

Reported complete (DPWH)

Start Date

August 31, 2023

Target End

May 21, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)Mountain ProvinceParacelisBantay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.