Bridges23PC0044

ORGANIZATIONAL OUTCOME 1;ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-CONSTRUCTION OF CONCRETE BRIDGE-PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), IGAN BRIDGE, APAYAO

ORGANIZATIONAL OUTCOME 1;ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-CONSTRUCTION OF CONCRETE BRIDGE-PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), IGAN BRIDGE, APAYAO is a DPWH-tracked public work in Apayao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱19,600,000.00. Status: Reported complete (DPWH). Contractor on record: SALTAN RIVER CORP 48044. Figures trace to dpwh.

Apayao 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Calabigan Flood Control Structure, Barangay Calabigan, Luna, Apayao
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Apayao 2nd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 48044

12 projects · ₱76.9M total · 0 flags

Other projects by this contractor

No sat.

LOCAL INFRASTRUCTURE PROGRAM: LOCAL ROADS AND BRIDGES: CONSTRUCTION OF BALBALASANG BRIDGE AND APPROACHES, BALBALASANG, BALBALAN, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2021₱14.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SAVANG BRIDGE, ALONG SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD (S00003ST) K0017+171, BRGY. NAKANMUAN, SABTANG, BATANES

Batanes DEO, Region II

2022₱9.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS; SAN VICENTE-SAVIDUG-CHAVAYAN-NAKANMUAN ROAD - (S00003ST) K0020+670-K0020+782, BRGY. MALAKDANG, SABTANG, BATANES

Batanes DEO, Region II

2022₱9.8M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS CONCRETING/IMPROVEMENT OF THE BALBALASANG LOCAL ROAD IN BARANGAY BALBALASANG, BALBALAN, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2021₱9.6M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS: KALINGA-ABRA ROAD K0523+628, BALBALAN, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2023₱2.9M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS: KALINGA-ABRA ROAD K0523+039, BALBALAN, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2023₱2.9M
Reported complete (DPWH)
View all 12 projects →

4. Implementation

Contract Amount

₱19,600,000.00

Progress

Reported complete (DPWH)

Start Date

May 17, 2023

Target End

January 2, 2024

5. Audit