SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROAD INCLUDING DRAINAGE STRUCTURE AT F. VIOLA HIGHWAY, SAN RAFAEL, BUL
SUSTAINABLE INFRAS. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD INCLUDING DRAINAGE STRUCTURE AT F. VIOLA HIGHWAY, SAN RAFAEL, BUL is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱96,499,264.98. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: C. Figures trace to dpwh.
Total Contract Cost

