Roads19PA0127

CONCRETING OF SITIO BILBILA-SITIO MANGANIP BRGY. CABARUAN FMR, BARANGAY CABARUAN, DANGLAS, ABRA

CONCRETING OF SITIO BILBILA-SITIO MANGANIP BRGY. CABARUAN FMR, BARANGAY CABARUAN, DANGLAS, ABRA is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱4,975,000.00. Status: Reported complete (DPWH). Contractor on record: BALLIGI CONST DEVELOPMENT CORP FORMERLY:BALLIGI CONST. Figures trace to dpwh.

Abra DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROV-19-0014890 · ₱159,955 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19PA0127 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-23 → 2025-06-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF SITIO BILBILA-SITIO MANGANIP BRGY. CABARUAN FMR, BARANGAY CABARUAN, DANGLAS, ABRA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROV-19-0014890

₱159,955.00 · FY2019

Released to Banquerohan National High School A an (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

33 projects · ₱385.0M total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM: LOCAL ROADS AND BRIDGES: LOCAL BRIDGE: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS- CONSTRUCTION OF BRIDGE LINKING BRGY. CALIGAYAN TO ANTAGAN 1ST TRAVERSING THE PINACANAUAN DE TUMAUINI

Region II, Region II

2020₱66.2M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF BONO-BONGAT ROAD, RIZAL, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2022₱29.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY - CONSTRUCTION OF REGIONAL HEADQUARTERS BUILDING, TUGUEGARAO CITY, CAGAYAN

Cagayan 3rd DEO, Region II

2022₱24.2M
Reported complete (DPWH)
No sat.

CONVERGENCE & SPECIAL SUPPORT PROG.- CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES INDUSTRIES & ECONOMIC ZONES - SAMPAGUITA, PADUL, PATAYA, FURAGUI, BANTAY RD LEADING TO CAG.-APAYAO RD, CARSUMCO, STO. DOMINGO, PIAT, CAG. IN SUPPORT OF SUGARCANE PRO

Cagayan 3rd DEO, Region II

2021₱21.1M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LIKS/NEW ROADS, ABRA-CERVANTES ROAD, ABRA

Abra DEO, Cordillera Administrative Region

2022₱19.6M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BABALAG WEST-LIWAN WEST-ALIBANGBANG

Lower Kalinga DEO, Cordillera Administrative Region

2024₱19.6M
Past target date (DPWH On-Going)
View all 33 projects →

4. Implementation

Contract Amount

₱4,975,000.00

Progress

Reported complete (DPWH)

Start Date

December 15, 2019

Target End

January 30, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)AbraDanglasCabaruan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.