Buildings and Facilities18PF0043

CONSTRUCTION OF PNP BUILDING, ACOP, TUBLAY,

CONSTRUCTION OF PNP BUILDING, ACOP, TUBLAY, is a DPWH-tracked public work in Benguet 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱979,568.46. Status: Reported complete (DPWH). Contractor on record: EFLER CONST AND ENT. Figures trace to dpwh.

Benguet 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-D-18-0007655 · ₱1,337,516 · release to the district office, not itemized per project

    Possible match · score 0.74

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18PF0043 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-11-23 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF PNP BUILDING, ACOP, TUBLAY,

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Palew Flood Control, Palew, Tublay, Benguet
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-D-18-0007655

₱1,337,516.00 · FY2018

Released to Benguet 2nd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

59 projects · ₱614.8M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF PROPER GADANG-LAO-ANGAN ROAD, KAPANGAN, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2024₱95.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER LAPALAP SECTION, STA. 10+802 - STA. 11+162 (BS), BUGUIAS, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2025₱41.1M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF 4 STOREY 8 CLASSROOM SCHOOL BUILDING, LAM-AYAN INTEGRATED SCHOOL, BUGUIAS, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2024₱39.8M
Past target date (DPWH On-Going)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS: GOV. BADO DANGWA NATIONAL RD - K0291+570 - K0291+670, K0292+136 - K0292+290, K0292+445 - K0292+520

Benguet 2nd DEO, Cordillera Administrative Region

2025₱38.8M
Past target date (DPWH On-Going)
No sat.

REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: BAGUIO- BONTOC ROAD - K0266+600 - K0266+700, K0267+150 - K0267+180, K0268+850 - K0268+920, K0270+015 - K0270+045, K0272+713 - K0272+770, TUBLAY- ATOK, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2023₱29.4M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS: BAGUIO-BONTOC RD - K0266+500-K0266+525, K0266+600-K0266+605, K0269+568-K0269+578, K0269+677-K0269+690, K0270+017-K0270+043, K0270+700-K0270+720, K0270+833-K0270+860, K0270+

Benguet 2nd DEO, Cordillera Administrative Region

2025₱27.2M
Past target date (DPWH On-Going)
View all 59 projects →

4. Implementation

Contract Amount

₱979,568.46

Progress

Reported complete (DPWH)

Start Date

March 7, 2018

Target End

June 4, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetTublayCaponga
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.