GAA 2025 OO-225PF0018

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER LAPALAP SECTION, STA. 10+802 - STA. 11+162 (BS), BUGUIAS, BENGUET

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER LAPALAP SECTION, STA. 10+802 - STA. 11+162 (BS), BUGUIAS, BENGUET is a DPWH-tracked public work in Benguet 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱41,146,225.95. Status: Past target date (DPWH On-Going). Contractor on record: EFLER CONST AND ENT. Figures trace to dpwh.

Benguet 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱42,000

    Probable match · score 0.97

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25PF0018 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    88% reported · imagery 2023-02-10 → 2023-02-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER LAPALAP SECTION, STA. 10+802 - STA. 11+162 (BS), BUGUIAS, BENGUET

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 97%

UACS
18001
Amount
₱42,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure within Agno River Basin: along Agno River Lapalap Section, Sta. 10+802 - Sta. 11+162 (BS), Buguias, Benguet
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Benguet 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

59 projects · ₱614.8M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF PROPER GADANG-LAO-ANGAN ROAD, KAPANGAN, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2024₱95.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF 4 STOREY 8 CLASSROOM SCHOOL BUILDING, LAM-AYAN INTEGRATED SCHOOL, BUGUIAS, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2024₱39.8M
Past target date (DPWH On-Going)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS: GOV. BADO DANGWA NATIONAL RD - K0291+570 - K0291+670, K0292+136 - K0292+290, K0292+445 - K0292+520

Benguet 2nd DEO, Cordillera Administrative Region

2025₱38.8M
Past target date (DPWH On-Going)
No sat.

REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE: BAGUIO- BONTOC ROAD - K0266+600 - K0266+700, K0267+150 - K0267+180, K0268+850 - K0268+920, K0270+015 - K0270+045, K0272+713 - K0272+770, TUBLAY- ATOK, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2023₱29.4M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS: BAGUIO-BONTOC RD - K0266+500-K0266+525, K0266+600-K0266+605, K0269+568-K0269+578, K0269+677-K0269+690, K0270+017-K0270+043, K0270+700-K0270+720, K0270+833-K0270+860, K0270+

Benguet 2nd DEO, Cordillera Administrative Region

2025₱27.2M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES BANGHO-DACLAN-BASIL-TUBLAY CENTRAL ROAD IN SUPPORT OF COFFEE, BAMBOO, CUTFLOWERS AND FRUIT TREE INDUSTRIES, TUBLAY, BENGUET, PACKAGE II

Benguet 2nd DEO, Cordillera Administrative Region

2021₱24.5M
Reported complete (DPWH)
View all 59 projects →

4. Implementation

Contract Amount

₱41,146,225.95

Progress

Past target date (DPWH On-Going)

Start Date

March 4, 2025

Target End

January 17, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetBuguiasBangao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.