Roads25RG0184

ORGANIZATIONAL OUTCOME 1-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE - TERTIARY ROADS-MABINAY-AYUNGON RD K0111 + 100 - K0115 + 000, AYUNGON, NEGROS ORIENTAL

ORGANIZATIONAL OUTCOME 1-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE - TERTIARY ROADS-MABINAY-AYUNGON RD K0111 + 100 - K0115 + 000, AYUNGON, NEGROS ORIENTAL is a DPWH-tracked public work in Negros Oriental 1st DEO, Negros Island Region. Reported contract value: ₱96,449,999.99. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: UY CONDEV CORP FORMERLY:UY CONST. Figures trace to dpwh.

Negros Oriental 1st DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱17,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25RG0184 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-07-25 → 2025-11-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱24,730,769 per km= 1.1x the Negros Island Region median (n=254)

Contract cost ₱96,450,000 ÷ 3.9 km read from the DPWH title (“K0111 + 100 - K0115 + 000”; K-post / station range length). National percentile: 46. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE - TERTIARY ROADS-MABINAY-AYUNGON RD K0111 + 100 - K0115 + 000, AYUNGON, NEGROS ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱17,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Barangay Tinaogan, Bindoy, Negros Oriental
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Negros Oriental 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

178 projects · ₱8.2B total · 0 flags

Other projects by this contractor

No sat.

IMPROVEMENT/ WIDENING OF NATIONAL ROADS ALONG BACOLOD SOUTH ROAD INCLUDING RROW (S00127NR), K0046+(-910) - K0048+533; K0059+781 - K0060+307.50; K0065+448 - K0071+696.60 , HINIGARAN AND BINALBAGAN, NEGROS OCCIDENTAL

Negros Occidental 2nd DEO, Negros Island Region

2017₱236.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE ROAD - BAYAWAN - KABANKALAN ROAD, INCL. RROW, NEGROS ORIENTAL, BAYAWAN, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2017₱215.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE ROAD - HIMAMAYLAN CITY - NEGROS ORIENTAL BOUNDARY - TAYASAN ROAD , NEGROS OCCIDENTAL

Region VI, Region VI

2018₱172.3M
Reported complete (DPWH)
No sat.

CSSP, SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, REHAB./RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DUMAGUETE NORTH RD (DUMAGUETE-JCT BAIS-KABANKALAN)-K0006+100-K0006+1017, K0006+1078-K0009+330, K0009+460-K0010+395,

Region VII, Region VII

2024₱154.8M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF REVETMENT STRUCTURE ALONG OCOY RIVER, BRGY. CALABNUGAN, SIBULAN, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2025₱146.3M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT/ WIDENING OF KABANKALAN - BAIS ROAD (S00240NR), K0093+218 - K0098+483, KABANKALAN, NEGROS OCCIDENTAL

Negros Occidental 3rd DEO, Negros Island Region

2017₱140.9M
Reported complete (DPWH)
View all 178 projects →

4. Implementation

Contract Amount

₱96,449,999.99

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

July 22, 2025

Target End

December 1, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalAyungonMabato
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.