GAA 2024 OO-124K00490

CONST. OF MISSING LINKS/NEW ROADS-EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/ AGUSAN DEL NORTE TO BUKIDNON, DAMAY-CALABUGAO-ADTOLAWON ROAD, PACKAGE 23, BUKIDNON

CONST. OF MISSING LINKS/NEW ROADS-EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/ AGUSAN DEL NORTE TO BUKIDNON, DAMAY-CALABUGAO-ADTOLAWON ROAD, PACKAGE 23, BUKIDNON is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱142,299,498.03. Status: Past target date (DPWH On-Going). Contractor on record: EQUI-PARCO CONST CO. Figures trace to dpwh.

Region X, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱142,299,498 · EQUI-PARCO CONST CO

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    95% reported · imagery 2023-12-11 → 2025-07-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST. OF MISSING LINKS/NEW ROADS-EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/ AGUSAN DEL NORTE TO BUKIDNON, DAMAY-CALABUGAO-ADTOLAWON ROAD, PACKAGE 23, BUKIDNON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24K00490

₱142,299,498.03 · EQUI-PARCO CONST CO

Award / contract ref: 24K00490

Contractor

B

725 projects · ₱77.9B total · 5 flags

4. Implementation

Contract Amount

₱142,299,498.03

Progress

Past target date (DPWH On-Going)

Start Date

October 21, 2024

Target End

July 17, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONST. OF MISSING LINKS/NEW ROADS-EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/ AGUSAN DEL NORTE TO BUKIDNON, DAMAY-CALABUGAO-ADTOLAWON ROAD, PACKAGE 23, BUKIDNON.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/b5391290-2790-4385-b875-547d010f617c

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)BukidnonManolo FortichMaluko
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.