Buildings and Facilities19OE0157

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, (COVERED COURT), ZONE 10-12, BARANGAY 124-126, MANILA

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, (COVERED COURT), ZONE 10-12, BARANGAY 124-126, MANILA is a DPWH-tracked public work in North Manila DEO, National Capital Region. Reported contract value: ₱4,812,293.96. Status: Reported complete (DPWH). Contractor on record: ALLEYWAY CONST. Figures trace to dpwh.

North Manila DEO, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-A-19-0005535 · ₱3,306,000 · release to the district office, not itemized per project

    Possible match · score 0.76

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱4,812,294 · ALLEYWAY CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-05-26 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, (COVERED COURT), ZONE 10-12,  BARANGAY 124-126, MANILA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-A-19-0005535

₱3,306,000.00 · FY2019

Released to Regional Office - XI (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Local Program

₱4,812,293.96 · ALLEYWAY CONSTRUCTION

Award / contract ref: 19OE0157

Contractor

B

49 projects · ₱1.0B total · 1 flags

Other projects by this contractor

No sat.

MFO 2-FLOOD MANAGMENT SERVICES CONSTRUCTION/MAINTENANCE OF LOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM: DRAINAGE IMPROVMENT ALONG YUSECO (INCLUDING KABULUSAN OUT FALL) TONDO, MANILA

North Manila DEO, National Capital Region

2017₱48.9M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT AND PATHWAYS, ZONE 1, 2, & 3, MANILA CITY

North Manila DEO, National Capital Region

2018₱47.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL- PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT AND PATHWAYS, ZONE 4, 5 & 6, MANILA CITY

North Manila DEO, National Capital Region

2018₱47.5M
Reported complete (DPWH)
No sat.

Rehabilitation of Drainage System at Zone 1-12, Tondo, Manila City

CITY OF MANILA (METROPOLITAN MANILA), CITY OF MANILA, National Capital Region

2022₱47.5M
Reported complete (DPWH)
No sat.

MFO 2 - FLOOD MANAGEMENT SERVICES CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD MITIGATION/STRUCTURES AND DRAINAGE SYSTEMS - M. EARNSHAW AND GOV. FORBES STREET, SAMPALOC, MANILA SAMPALOC, MANILA CITY

North Manila DEO, National Capital Region

2017₱46.3M
Reported complete (DPWH)
No sat.

REHABILITATION / IMPROVEMENT OF ROADS AND ALLEYS INCLUDING DRAINAGE, BRGY. 1-146, MANILA CITY

North Manila DEO, National Capital Region

2020₱39.6M
Reported complete (DPWH)
View all 49 projects →

4. Implementation

Contract Amount

₱4,812,293.96

Progress

Reported complete (DPWH)

Start Date

June 20, 2019

Target End

October 17, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ManilaTondo I/IIBarangay 125
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.