Roads24CG0183

BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF STA. ANA - SAN LUIS ROAD, SAN JOSE - STA. MARIA, STA. ANA, PAMPANGA

BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF STA. ANA - SAN LUIS ROAD, SAN JOSE - STA. MARIA, STA. ANA, PAMPANGA is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱38,411,968.47. Status: Reported complete (DPWH). Contractor on record: NES-SAN BUILDERS. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24CG0183 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-10-29 → 2025-11-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF STA. ANA - SAN LUIS ROAD, SAN JOSE - STA. MARIA, STA. ANA, PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Pampanga River, Apalit, Pampanga
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Pampanga 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

69 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ROADS AND DRAINAGE AT ANGELES CITY, PAMPANGA PHASE 4

Pampanga 3rd DEO, Region III

2025₱81.0M
Past target date (DPWH On-Going)
No sat.

Construction of Slope Protection Works at Maasim River, Phase I (Tributary Of Pampanga River) barangay Pulong Gubat, Candaba, Pampanga

CANDABA (PAMPANGA), PAMPANGA, Region III

2023₱70.2M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ARAYAT - MAGALANG (ARAYAT SECTION) BYPASS ROAD, PAMPANGA

Pampanga 1st DEO, Region III

2020₱46.9M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF MAIN ROAD (LAPUT - CONCEPCION ROAD INCLUDING DRAINAGE SYSTEM), ME

Pampanga 1st DEO, Region III

2025₱46.8M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING (TERTIARY ROADS) CANDABA - SAN MIGUEL ROAD K0073+408 - K0073+674; K0074+000 TO K0075+753, CANDABA, PAMPANGA

Pampanga 1st DEO, Region III

2018₱43.5M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF STA. BARBARA - MALIWALU ROAD, BACOLOR, PAMPANGA

Pampanga 1st DEO, Region III

2022₱37.6M
Reported complete (DPWH)
View all 69 projects →

4. Implementation

Contract Amount

₱38,411,968.47

Progress

Reported complete (DPWH)

Start Date

May 29, 2024

Target End

December 18, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaSanta AnaSanta Maria
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.