Roads24ED0101

CONSTRUCTION OF DRAINAGE CANAL, ZONE 2 AND 3, IBABA EAST, CALAPAN CITY, ORIENTAL MINDORO

CONSTRUCTION OF DRAINAGE CANAL, ZONE 2 AND 3, IBABA EAST, CALAPAN CITY, ORIENTAL MINDORO is a DPWH-tracked public work in Mindoro Oriental DEO, Region IV-B. Reported contract value: ₱4,949,800.00. Status: Reported complete (DPWH). Contractor on record: N. Figures trace to dpwh.

Mindoro Oriental DEO, Region IV-B
Region: Region IV-B

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱20,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24ED0101 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-05-09 → 2023-05-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF DRAINAGE CANAL, ZONE 2 AND 3, IBABA EAST, CALAPAN CITY, ORIENTAL MINDORO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Longos River ( Downstream ) , Calapan City, Oriental Mindoro
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Mindoro Oriental DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

9 projects · ₱50.0M total · 0 flags

Other projects by this contractor

No sat.

LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OFCOVERED COURT AT ALINGARO ELEMENTARY SCHOOL, ALINGARO, GEN. TRIAS; SALABAN ELEMENTARY SCHOOL, SALABAN, AMADEO AND CABUCO, TRECEMARTIRES, CAVITE 6TH LD

Cavite 1st DEO, Region IV-A

2017₱9.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN FRANCISCO, GENERAL TRIAS AND CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SANTIAGO, GENERAL TRIAS, CAV

Cavite 1st DEO, Region IV-A

2021₱9.4M
Past target date (DPWH On-Going)
No sat.

FARM-TO-MARKET ROAD PROJECT - CONCRETING OF BRGY. PASONG KAWAYAN I FMR, BRGY. PASONG KAWAYAN I, GENERAL TRIAS, CAVITE

Cavite 1st DEO, Region IV-A

2017₱5.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONCRETING OF ROAD AT BARANGAY BUCAL-MINANTOK, AMADEO, CAVITE

Cavite 1st DEO, Region IV-A

2022₱5.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONCRETING OF ROAD AT BARANGAY MAITIM, AMADEO, CAVITE

Cavite 1st DEO, Region IV-A

2022₱5.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING (COVERED COURT) AT BARANGAY CALUBAYAN, SOCORRO, ORIENTAL MINDORO

Mindoro Oriental DEO, Region IV-B

2023₱4.9M
Reported complete (DPWH)
View all 9 projects →

4. Implementation

Contract Amount

₱4,949,800.00

Progress

Reported complete (DPWH)

Start Date

February 22, 2024

Target End

September 2, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOriental MindoroCity of CalapanIbaba East
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.