Buildings and Facilities20AG0054

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, BANI, PANGASINAN

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, BANI, PANGASINAN is a DPWH-tracked public work in Pangasinan 1st DEO, Region I. Reported contract value: ₱2,350,990.00. Status: Reported complete (DPWH). Contractor on record: JONIK TRADING. Figures trace to dpwh.

Pangasinan 1st DEO, Region I
Region: Region I

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱27,427

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20AG0054 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-11-29 → 2025-10-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, BANI, PANGASINAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱27,427,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Facility for Brgy. Poblacion, Bani, Pangasinan
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Pangasinan 1st DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

415 projects · ₱3.3B total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION/CONSTRUCTION OF ROADS, CITY OF ALAMINOS, PANGASINAN

Pangasinan 1st DEO, Region I

2025₱98.0M
Past target date (DPWH On-Going)

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES IN BALINGCAGUING RIVER (POBLACION EAST SECTION), BRGY. POBLACION EAST, AGNO, PANGASINAN

Pangasinan 1st DEO, Region I

2025₱94.6M
Reported complete (DPWH)
No sat.

PREVENTIVE MAINTENANCE, PANGASINAN-ZAMBALES RD - K0284+000 - K0285+000, K0299+000 - K0300+000, K0321+000 - K0323+000, K0325+088 - K0325+300, K0326+400 - K0327+034, K0327+228 - K0328+000, K0329+000 - K0329+240.9

Region I, Region I

2019₱61.8M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - RECONSTRUCTION OF MULTI-PURPOSE BUILDING, DON RAYMUNDO CELESTE SPORTS COMPLEX, BARANGAY GERMINAL, BOLINAO, PANGASINAN

Pangasinan 1st DEO, Region I

2023₱49.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - ALAMINOS - BOLINAO RD - K0322 + 328 - K0323 + 793 AT BARANGAY POGO, ALAMINOS CITY, PANGASINAN

Pangasinan 1st DEO, Region I

2024₱42.7M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - ALAMINOS - BOLINAO RD - K0337 + 000 - K0339 + 632, K0340 + 530 - K0341 + 822 AT BANI, PANGASINAN

Pangasinan 1st DEO, Region I

2023₱40.2M
Reported complete (DPWH)
View all 415 projects →

4. Implementation

Contract Amount

₱2,350,990.00

Progress

Reported complete (DPWH)

Start Date

January 31, 2020

Target End

April 29, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)PangasinanBaniPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.