Buildings and Facilities17BH0046

CONSTRUCTION OF 1 STY 3-CL OF DIVISORIA ES

CONSTRUCTION OF 1 STY 3-CL OF DIVISORIA ES is a DPWH-tracked public work in Isabela 4th DEO, Region II. Reported contract value: ₱3,356,100.00. Status: Reported complete (DPWH). Contractor on record: C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC. Figures trace to dpwh.

Isabela 4th DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱48,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROX-17-0010856 · · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17BH0046 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-03-31 → 2025-06-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,118,700 per classroom= 0.9x the Region II median (n=370)

Contract cost ₱3,356,100 ÷ 3 classroom read from the DPWH title (“3-CL”; classroom count in title). National percentile: 9. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1 STY 3-CL OF DIVISORIA ES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱48,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Diarao Flood Control Project, Diarao, Jones, Isabela
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROX-17-0010856

₱-100,000,000.00 · FY2017

Released to Regional Office X - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

87 projects · ₱3.2B total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, ROMAN EXPRESSWAY, PROVINCE OF BATAAN

Region III, Region III

2019₱131.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF QUIMALABASA NORTE FLOOD CONTROL STRUCTURE SECTION 5,

Isabela 4th DEO, Region II

2025₱106.1M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SANTIAGO CIRCUMFERENTIAL ROAD, ISABELA

Region II, Region II

2021₱104.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAUAYAN CITY BY-PASS ROAD, PACKAGE 1, ISABELA; STA. 000+000-STA. 001+085

Region II, Region II

2020₱103.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ), CORDON AND SANTIAGO, ISABELA

Region II, Region II

2020₱99.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES: VILLA GAMIAO, SAN ANTONIO, DARAMUANGAN SUR AND SALINUNGAN EAST ROADS CONNECTING TO MUNGGO PROCESSING AND PACKAGING CENTER

Region II, Region II

2021₱97.8M
Reported complete (DPWH)
View all 87 projects →

4. Implementation

Contract Amount

₱3,356,100.00

Progress

Reported complete (DPWH)

Start Date

November 16, 2017

Target End

April 14, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaCity of Santiago
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.