Buildings and Facilities17RF0087No coordinates published by DPWH

CONSTRUCTION OF 1 STOREY 2 CL SCHOOL BUILDING AT MACALOS EXT., HIGH SCHOOL (BULADO HS) (UNIT ONE), GUIHULNGAN CITY, NEGROS ORIENTAL

CONSTRUCTION OF 1 STOREY 2 CL SCHOOL BUILDING AT MACALOS EXT., HIGH SCHOOL (BULADO HS) (UNIT ONE), GUIHULNGAN CITY, NEGROS ORIENTAL is a DPWH-tracked public work in Negros Oriental 1st DEO, Negros Island Region. Reported contract value: ₱2,840,967.52. Status: Reported complete (DPWH). Contractor on record: R R GADINGAN CONST. Figures trace to dpwh.

Negros Oriental 1st DEO, Negros Island Region

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Negros Island Region

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱40,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-CAR-17-0012607 · · release to the district office, not itemized per project

    Possible match · score 0.69

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱2,840,968 · R.R. GADINGAN CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1 STOREY 2 CL SCHOOL BUILDING AT MACALOS EXT., HIGH SCHOOL (BULADO HS) (UNIT ONE), GUIHULNGAN CITY, NEGROS ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Baterian Flood Control along Dumaguete North Road, Guihulngan City, Negros Oriental
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-CAR-17-0012607

₱-4,999.00 · FY2017

Released to Regional Office - CAR (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Project

₱2,840,967.52 · R.R. GADINGAN CONSTRUCTION

Award / contract ref: 17RF0087

Contractor

C

81 projects · ₱419.8M total · 0 flags

4. Implementation

Contract Amount

₱2,840,967.52

Progress

Reported complete (DPWH)

Start Date

January 2, 2018

Target End

May 26, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalCity of Guihulngan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.