Roads21CD0155

CONCRETING OF BRGY. ALAGAO FMR, BRGY. ALAGAO, SAN ILDEFONSO, BULACAN

CONCRETING OF BRGY. ALAGAO FMR, BRGY. ALAGAO, SAN ILDEFONSO, BULACAN is a DPWH-tracked public work in Bulacan 2nd DEO, Region III. Reported contract value: ₱13,370,863.52. Status: Reported complete (DPWH). Contractor on record: EMICA BUILDERS AND SUPPLY. Figures trace to dpwh.

Bulacan 2nd DEO, Region III
Region: Region III

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱37,140

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱13,370,864 · EMICA BUILDERS AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-05 → 2020-03-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. ALAGAO FMR, BRGY. ALAGAO, SAN ILDEFONSO, BULACAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱37,140,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures, Anyatam, San Ildefonso, Bulacan
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Bulacan 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

21CD0155 Concreting of Brgy. Alagao FMR

₱13,370,863.52 · EMICA BUILDERS AND SUPPLY

Award / contract ref: 21CD0155

Contractor

B

55 projects · ₱714.7M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRA. PROGRAM (BIP) - BIP - MULTI-PURPOSE BLDGS./ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING SAPANG PUTIK ELEMENTARY SCHOOL, BARANGAY SAPANG PUTIK, SAN ILDEFONSO, BULACAN

Bulacan 3rd DEO, Region III

2025₱43.9M
Ongoing (DPWH-reported)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - BIP - MULTI -PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT UPIG ELEMENTARY SCHOOL, BARANGAY UPIG, SAN ILDEFONSO, BULACAN

Region III, Region III

2024₱39.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, CALUMPANG ELEMENTARY SCHOOL, SAN MIGUEL, BULACAN

Bulacan 3rd DEO, Region III

2025₱34.1M
Ongoing (DPWH-reported)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF DRAINAGE FACILITIES (MARONQUILLO AND TALACSAN), SAN RAFAEL,BULACAN

Region III, Region III

2024₱24.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

Construction of Yangco Pumping Station, Brgy. Navotas East, Navotas City

CITY OF NAVOTAS (METROPOLITAN MANILA), NAVOTAS CITY, National Capital Region

2023₱24.7M
Reported complete (DPWH)
No sat.

Construction of Martiniko Pumping Station (Boundary of Navotas and Malabon), NBBS Dagat-Dagatan, Navotas City

CITY OF NAVOTAS (METROPOLITAN MANILA), NAVOTAS CITY, National Capital Region

2023₱19.8M
Reported complete (DPWH)
View all 55 projects →

4. Implementation

Contract Amount

₱13,370,863.52

Progress

Reported complete (DPWH)

Start Date

June 23, 2021

Target End

November 19, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanSan IldefonsoAlagao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.