GAA 2016 MFO-116P00032

RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS) JCT TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD ROAD, K0412+450 - K0416+064

RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS) JCT TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD ROAD, K0412+450 - K0416+064 is a DPWH-tracked public work in Cordillera Administrative Region, Cordillera Administrative Region. Reported contract value: ₱140,334,959.19. Status: Reported complete (DPWH). Contractor on record: A I P CONST. Figures trace to dpwh.

Cordillera Administrative Region, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16P00032 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-01-01 → 2025-04-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱38,830,924 per km= 1.0x the Cordillera Administrative Region median (n=103)

Contract cost ₱140,334,959 ÷ 3.614 km read from the DPWH title (“K0412+450 - K0416+064”; K-post / station range length). National percentile: 76. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS) JCT TALUBIN - BARLIG - NATONIN - PARACELIS - CALACCAD ROAD, K0412+450 - K0416+064

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

141 projects · ₱9.3B total · 1 flags

Other projects by this contractor

No sat.

CLUSTER: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS MT. PROVINCE - CAGAYAN VIA TABUK - ENRILE R

Cordillera Administrative Region, Cordillera Administrative Region

2021₱289.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLIS

Cordillera Administrative Region, Cordillera Administrative Region

2021₱284.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A)

Cordillera Administrative Region, Cordillera Administrative Region

2020₱235.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLISTT O

Cordillera Administrative Region, Cordillera Administrative Region

2022₱193.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MT. PROVINCE - ILOCOS SUR VIA TUE RD, K0387+(-081) - K0388+189, K0388+227 - K0388+867, K0388+939 - K0388+1069

Cordillera Administrative Region, Cordillera Administrative Region

2024₱193.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MT. PROVINCE - N VIZCAYA RD - K0363+(-785) - K0372+1019, K0372+1041 - K0375+000BONTOC, MT. PROVINCE

Cordillera Administrative Region, Cordillera Administrative Region

2024₱193.0M
Past target date (DPWH On-Going)
View all 141 projects →

4. Implementation

Contract Amount

₱140,334,959.19

Progress

Reported complete (DPWH)

Start Date

June 12, 2016

Target End

May 14, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)Mountain ProvinceBontocTalubin
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.