Buildings and Facilities22BD0102

LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MEGA ISOLATION FACILITIES, TUGUEGARAO CITY, CAGAYAN

LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MEGA ISOLATION FACILITIES, TUGUEGARAO CITY, CAGAYAN is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱72,375,000.00. Status: Past target date (DPWH On-Going). Contractor on record: ROGELIO M DIMAANDAL CONST. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22BD0102 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    45% reported · imagery 2021-05-03 → 2025-09-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MEGA ISOLATION FACILITIES, TUGUEGARAO CITY, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of River Flood Control System at Zone 2 and Zone 3 Dalla, Baggao, Cagayan
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Cagayan 3rd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

15 projects · ₱353.9M total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM: BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES-NATIONAL BUILDING PROGRAM: CONSTRUCTION /EXTENSION OF DPWH-REGIONAL OFFICE II BUILDING, REG'L GOV'T CENTER, CARIG SUR, TUGUEGARAO CITY, CAGAYAN

Region II, Region II

2019₱48.2M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF TWO-STOREY BUILDING (DPWH) STANDARD DESIGN) OF CAGAYAN 3RD DISTRICT ENGINEERING OFFICE, TUGUEGARAO CITY, CAGAYAN

Cagayan 3rd DEO, Region II

2020₱37.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF THREE (3) STOREY TWELVE (12) CLASSROOM (TWO (2) REGULAR WORKSHOP/TWO (2) CLASSROOM SCIENCE LABORATORY & TWO (2) CLASSROOM ICT), GADU NATIONAL HIGH SCHOOL-NANGALISAN EXTENSION, SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2018₱29.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF THREE (3) STOREY TWELVE (12) CLASSROOM (TWO (2)CLASSROOM SCIENCE LABORATORY/TWO (2) CLASSROOM ICT & TWO (2) CLASSROOM REGULAR WORKSHOP BUILDING), GAMMAD NATIONAL HIGH SCHOOL, IGUIG, CAGAYAN

Cagayan 3rd DEO, Region II

2018₱27.0M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF DORMITORY AT CSU CARIG, TUGUEGARAO CITY, CAGAYAN

Cagayan 3rd DEO, Region II

2023₱19.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING PERIMETER FENCE, CAGAYAN STATE UNIVERSITY (CSU)- CARIG CAMPUS, BRGY. CARIG, TUGUEGARAO CITY, CAGAYAN

Cagayan 3rd DEO, Region II

2020₱19.2M
Reported complete (DPWH)
View all 15 projects →

4. Implementation

Contract Amount

₱72,375,000.00

Progress

Past target date (DPWH On-Going)

Start Date

July 5, 2022

Target End

April 5, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanTuguegarao CityCarig
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.