CONST./REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG ZAPOTE RIVER FROM ZAPOTE TO BRGY. TALON 2, L
CONST./REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG ZAPOTE RIVER FROM ZAPOTE TO BRGY. TALON 2, L is a DPWH-tracked public work in Las Piñas-Muntinlupa DEO, National Capital Region. Reported contract value: ₱26,471,942.21. Status: Reported complete (DPWH). Contractor on record: L M G CONST INC FORMERLY: LMG CONST. Figures trace to dpwh.
DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.
No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.
Total Contract Cost

