GAA 2025 SSP25NH0092

CONSTRUCTION OF MEDIAN / CENTER ISLAND ALONG SURIGAO - DAVAO COASTAL RD. K1298 + 396 - K1302 + 696, TANDAG CITY, SURIGAO DEL SUR

CONSTRUCTION OF MEDIAN / CENTER ISLAND ALONG SURIGAO - DAVAO COASTAL RD. K1298 + 396 - K1302 + 696, TANDAG CITY, SURIGAO DEL SUR is a DPWH-tracked public work in Surigao del Sur 1st DEO, Region XIII. Reported contract value: ₱13,552,101.79. Status: Past target date (DPWH On-Going). Contractor on record: TRIDENT ENGINEERING SERVICES. Figures trace to dpwh.

Surigao del Sur 1st DEO, Region XIII
Region: Region XIII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱50,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25NH0092 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    93% reported · imagery 2024-07-24 → 2024-07-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱3,151,652 per km= 0.1x the Region XIII median (n=88)

Contract cost ₱13,552,102 ÷ 4.3 km read from the DPWH title (“K1298 + 396 - K1302 + 696”; K-post / station range length). National percentile: 0. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MEDIAN / CENTER ISLAND ALONG SURIGAO - DAVAO COASTAL RD. K1298 + 396 - K1302 + 696, TANDAG CITY, SURIGAO DEL SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Purok Lansones I, Barangay San Agustin, Tandag City, Surigao del Sur
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Surigao del Sur 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

4. Implementation

Contract Amount

₱13,552,101.79

Progress

Past target date (DPWH On-Going)

Start Date

June 25, 2025

Target End

September 29, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Surigao del SurCity of TandagBagong Lungsod
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.