GAA 2024 OO-124DJ0064

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM -ROAD WIDENING - TERTIARY ROADS, SN JUAN-CANDELARIA JCT-CANDELARIA-BOLBOC RD-K0147+631-K0147+903

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM -ROAD WIDENING - TERTIARY ROADS, SN JUAN-CANDELARIA JCT-CANDELARIA-BOLBOC RD-K0147+631-K0147+903 is a DPWH-tracked public work in Quezon 2nd DEO, Region IV-A. Reported contract value: ₱19,110,000.00. Status: Past target date (DPWH On-Going). Contractor on record: WYDERWAYS BUILDERS AND SUPPLIES. Figures trace to dpwh.

Quezon 2nd DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱5,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24DJ0064 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    97% reported · imagery 2021-05-31 → 2025-05-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱70,257,353 per km= 1.6x the Region IV-A median (n=330)

Contract cost ₱19,110,000 ÷ 0.272 km read from the DPWH title (“K0147+631-K0147+903”; K-post / station range length). National percentile: 94. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM -ROAD WIDENING - TERTIARY ROADS, SN JUAN-CANDELARIA JCT-CANDELARIA-BOLBOC RD-K0147+631-K0147+903

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Brgy. Marketview, Lucena City
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Quezon 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

40 projects · ₱800.9M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (LUCENA GENERAL HOSPITAL), LUCENA CITY, QUEZON

Quezon 2nd DEO, Region IV-A

2024₱144.0M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM: NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION (COMPLETION) OF FOUR-STOREY MULTI-PURPOSE BUILDING WITH EMPLOYEE'S QUARTERS OF DPWH QUEZON 2ND DEO, DALAHICAN ROAD, BARANGAY IBABANG DUPAY, LUC

Quezon 2nd DEO, Region IV-A

2023₱86.8M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 3), LUCENA CITY

Quezon 2nd DEO, Region IV-A

2024₱79.1M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 12), LUCENA CIT

Quezon 2nd DEO, Region IV-A

2023₱77.2M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION (COMPLETION) OF 3 STOREY CAMP NAKAR STATION HOSPITAL BUILDING, SOUTHERN LUZON COMMAND, LUCENA CITY

Quezon 2nd DEO, Region IV-A

2024₱75.7M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD (PACKAGE 7), QUEZON

Quezon 2nd DEO, Region IV-A

2022₱49.0M
Reported complete (DPWH)
View all 40 projects →

4. Implementation

Contract Amount

₱19,110,000.00

Progress

Past target date (DPWH On-Going)

Start Date

April 18, 2024

Target End

October 14, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonCandelariaSanta Catalina Sur
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.