Roads22BD0010

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY BACCUIT, AMULUNG, CAGAYAN

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY BACCUIT, AMULUNG, CAGAYAN is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱6,349,381.35. Status: Reported complete (DPWH). Contractor on record: CSD ENGINEERING AND CONST. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22BD0010 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-05-03 → 2025-09-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY BACCUIT, AMULUNG, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control at Zone 1 along National Road of Barangay Barsat East, Baggao, Cagayan
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Cagayan 3rd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

31 projects · ₱216.3M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF THREE(3) STOREY TWELVE (12) CLASSROOM TWO (2) CLASSROOM SCIENCE LABORATORY/TWO (2) CLASSROOM REGULAR WORKSHOP AND TWO (2) ICT, CABBO NATIONAL HIGH SCHOOL, PEÑABLANCA, CAGAYAN

Cagayan 3rd DEO, Region II

2018₱27.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION AND COMPLETION OF TWO-STOREY 12 CLASSROOMS SCHOOL BUILDING (2-REGULAR WORKSHOP, 2 SCI.LAB., 2-ICT LAB.) (9.5M X 64.00M), CALAOAGAN DACKEL NHS-CAPISSAYAN ANNEX, CALAOAGAN DACKEL, GATTARAN, CAGAYAN

Cagayan 1st DEO, Region II

2018₱27.2M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION OF NAT'L RD - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NAT'L RD INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HDM-4: RIZAL NATIONAL ROAD (LIWAN WEST - BABALAG - MACUTAY SECTION)

Lower Kalinga DEO, Cordillera Administrative Region

2018₱20.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ROAD FROM SITIO ACEGA, KINAMA, RIZAL TO TUAO CONNECTING RIZAL NATIONAL RD (BABALAG-SAN FRANCISCO SECTION) AND KINAMA IN SUPPORT OF SUGARCANE PROCESSING AND BANANA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱15.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION AND COMPLETION OF TWO-STOREY 6-CL SCHOOL BUILDING (9.5M X 36.00M), MOCAG ES, BAGGAO, CAGAYAN

Cagayan 1st DEO, Region II

2018₱13.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION AND COMPLETION OF TWO-STOREY 6-CL SCHOOL BUILDING (9.5M X 36.00M), ARIDOWEN ES, STA. TERESITA, CAGAYAN

Cagayan 1st DEO, Region II

2018₱13.0M
Reported complete (DPWH)
View all 31 projects →

4. Implementation

Contract Amount

₱6,349,381.35

Progress

Reported complete (DPWH)

Start Date

January 28, 2022

Target End

June 26, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanAmulungBaccuit
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.