GAA 2025 SSP25CO0046No coordinates published by DPWH

CONVERGENCE AND SPECIAL SUPPORT PROG - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/ APPLICATION/ CONSTRUCTION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BATAAN TECHNICAL PARK INC RD (BTPI) - MORONG, BAT.

CONVERGENCE AND SPECIAL SUPPORT PROG - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/ APPLICATION/ CONSTRUCTION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BATAAN TECHNICAL PARK INC RD (BTPI) - MORONG, BAT. is a DPWH-tracked public work in Bataan 3rd DEO, Region III. Reported contract value: ₱95,702,066.24. Status: Past target date (DPWH On-Going). Contractor on record: ONE FRAME CONST INC. Figures trace to dpwh.

Bataan 3rd DEO, Region III

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region III

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱95,702,066 · ONE FRAME CONST INC

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    0% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROG - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/ APPLICATION/ CONSTRUCTION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BATAAN TECHNICAL PARK INC RD (BTPI) - MORONG, BAT.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Masuaje River, Pilar, Bataan
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Bataan 3rd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25CO0046

₱95,702,066.24 · ONE FRAME CONST INC

Contractor

F

36 projects · ₱3.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF SIBUL - DRT ROAD, DONA REMEDIOS TRINIDAD, BULACAN (PHASE 2)

Bulacan 3rd DEO, Region III

2025₱97.6M
Past target date (DPWH On-Going)
No sat.

CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF UMPUCAN- SUMANDIG ROAD, SAN ILDEFONSO, BULACAN (PACKAGE B)

Bulacan 3rd DEO, Region III

2025₱97.5M
Past target date (DPWH On-Going)
No sat.

CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF UMPUCAN- SUMANDIG ROAD, SAN ILDEFONSO, BULACAN (PACKAGE C)

Bulacan 3rd DEO, Region III

2025₱97.5M
Ongoing (DPWH-reported)
No sat.

CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES - REHABILITATION OF UMPUCAN - SUMANDIG ROAD, SAN ILDEFONSO, BULACAN (PACKAGE E)

Bulacan 3rd DEO, Region III

2025₱97.5M
Ongoing (DPWH-reported)
No sat.

CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF UMPUCAN- SUMANDIG ROAD, SAN ILDEFONSO, BULACAN (PACKAGE D)

Bulacan 3rd DEO, Region III

2025₱97.5M
Past target date (DPWH On-Going)
No sat.

CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF UMPUCAN- SUMANDIG ROAD, SAN ILDEFONSO, BULACAN (PACKAGE A)

Bulacan 3rd DEO, Region III

2025₱97.4M
Past target date (DPWH On-Going)
View all 36 projects →

4. Implementation

Contract Amount

₱95,702,066.24

Progress

Past target date (DPWH On-Going)

Start Date

June 10, 2025

Target End

November 6, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BataanMorong
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.