Buildings and Facilities22C00032

LOCAL PROGRAM-NATIONAL BLDG. PROGRAM-BLDGS. & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONST. OF BLDG. FOR VIROLOGY INSTITUTE OF SCIENCE AND TECH. OF THE PHILIPPINES (VIP), NEW CLARK CITY, CLARK FREEPORT AND SPECIAL ECONOMIC ZONE (CFEZ), CAPAS, TARLAC.

LOCAL PROGRAM-NATIONAL BLDG. PROGRAM-BLDGS. & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONST. OF BLDG. FOR VIROLOGY INSTITUTE OF SCIENCE AND TECH. OF THE PHILIPPINES (VIP), NEW CLARK CITY, CLARK FREEPORT AND SPECIAL ECONOMIC ZONE (CFEZ), CAPAS, TARLAC. is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱142,552,971.03. Status: Past target date (DPWH On-Going). Contractor on record: EDFROBON CONST SERVICES INC. Figures trace to dpwh.

Region III, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱142,552,971

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    68% reported · imagery 2022-01-13 → 2025-01-11

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM-NATIONAL BLDG. PROGRAM-BLDGS. & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONST. OF BLDG. FOR VIROLOGY INSTITUTE OF SCIENCE AND TECH. OF THE PHILIPPINES (VIP), NEW CLARK CITY, CLARK FREEPORT AND SPECIAL ECONOMIC ZONE (CFEZ), CAPAS, TARLAC.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2022 GAA. DBM GAA FY2022

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

22C00032

₱142,552,971.03 · Awardee from PhilGEPS

Award / contract ref: 22C00032

Contractor

D

19 projects · ₱1.6B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM-NATIONAL BLDG. PROGRAM-BLDGS, & OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONST. OF BLDS. FOR VIROLOGY INSTITUTE OF SCIENCE AND TECHNOLOGY OF THE PHILS. (VIP), NEW CLARK CITY, CLARK FREEPORT & SPL. ECONOMIC ZONE (CFEZ), CAPAS, TARLAC

Region III, Region III

2023₱236.5M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE & SPECIAL SUPPORT PROGRAM-CONST./IMPR'VT. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY-CONST. OF ARMY LEADERSHIP DEV'T. & EDUCATION CENTER (ALDEC) PHASE I-TRADOC MPB, TRADOC, PA, CAMP O'DONNEL, CAPAS, TARLAC, PROV. OF TARLAC

Region III, Region III

2020₱117.6M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION)-PACKAGE 5, PROVINCE OF PAMPANGA

Region III, Region III

2022₱99.4M
Reported complete (DPWH)

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BARANGAY SAN JUAN, SAN MIGUEL, BULACAN, PACKAGE I

Region III, Region III

2024₱96.5M
Reported complete (DPWH)

Rehabilitation of Flood Control Structure along Meycauayan River, Barangay Tawiran to Wawang Pulo, Sta. 02+356 - Sta. 02+496, Obando, Bulacan

OBANDO (BULACAN), BULACAN, Region III

2024₱96.5M
Reported complete (DPWH)

Construction of Riverwall (Phase II) along Sacobia River, Barangay Calumpang, Mabalacat City, Pampanga

MABALACAT CITY (PAMPANGA), PAMPANGA, Region III

2024₱96.5M
Reported complete (DPWH)
View all 19 projects →

4. Implementation

Contract Amount

₱142,552,971.03

Progress

Past target date (DPWH On-Going)

Start Date

November 14, 2022

Target End

November 8, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)TarlacCapasMaruglu
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.