Bridges20JB0026

RETROFITTING / STRENGTHENING OF BRIDGE - BALOK BR (B00137MN) ALONG SINDANGAN - SIAYAN - DUMINGAG - MAHAYAG ROAD (SINDANGAN-SIAYAN SECTION), ZAMBOANGA DEL NORTE.

RETROFITTING / STRENGTHENING OF BRIDGE - BALOK BR (B00137MN) ALONG SINDANGAN - SIAYAN - DUMINGAG - MAHAYAG ROAD (SINDANGAN-SIAYAN SECTION), ZAMBOANGA DEL NORTE. is a DPWH-tracked public work in Zamboanga del Norte 2nd DEO, Region IX. Reported contract value: ₱2,397,267.20. Status: Reported complete (DPWH). Contractor on record: CYRUS JAMES BUILDERS AND SUPPLIES. Figures trace to dpwh.

Zamboanga del Norte 2nd DEO, Region IX
Region: Region IX

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱30,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱2,397,267 · CYRUS JAMES BUILDERS AND SUPPLIES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-01 → 2024-12-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: RETROFITTING / STRENGTHENING OF BRIDGE - BALOK BR (B00137MN) ALONG SINDANGAN - SIAYAN - DUMINGAG - MAHAYAG ROAD (SINDANGAN-SIAYAN SECTION), ZAMBOANGA DEL NORTE.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/extension of flood control structure (Revetment/Bank protection) along Dipolog River, (Polanco Bridge Section), Polanco, Zamboanga del Norte
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Zamboanga del Norte 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20JB0025

₱2,397,267.20 · CYRUS JAMES BUILDERS AND SUPPLIES

Award / contract ref: 20JB0026

Contractor

A

50 projects · ₱608.4M total · 0 flags

4. Implementation

Contract Amount

₱2,397,267.20

Progress

Reported complete (DPWH)

Start Date

February 20, 2020

Target End

April 8, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga del NorteSindanganBalok
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultLandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.