CYRUS JAMES BUILDERS AND SUPPLIES is listed as a company organization in Philippine public procurement records on this site, with 50 linked DPWH project(s) totaling about ₱608,354,318.53. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
CYRUS JAMES BUILDERS AND SUPPLIES
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 50
- Total value
- ₱608,354,318.53
- Published flags
- 0
- Region
- Bukidnon 2nd DEO · Region X
Licensed officers (PCAB)
- jennifer saavedra del rosario · Authorized Managing Officer (PCAB license 41070) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for CYRUS JAMES BUILDERS AND SUPPLIES — not an accusation or finding of wrongdoing.
Score: 90.70 / 100 · Projects in sample: 50 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 90.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 90.2
- lateCompletedProjects
- 6
- onTimeCompletedProjects
- 43
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 50
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 50
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 50
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 50
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 50
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
50 geotagged projects — Open full map
- WIDENING OF PERMANENT BRIDGE UGUIABAN BR. (B01399MN) ALONG CDO CITY-DOMINOROG-CAMP KIBARITAN RD., TALAKAG, BUKIDNON23KC0059 · ₱57,900,000.00 · mapped
- REHAB/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG BUKIDNON-DAVAO ROAD, K1591+450 - K1591+562, PALACAPAO, QUEZON, BUKIDNON20KB0044 · ₱52,110,000.00 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGE DICKLUM BR. (B01495MN) ALONG SAYRE HIGHWAY, MANOLO FORTICH, BUKIDNON24KC0044 · ₱47,040,000.00 · mapped
- ROAD WIDENING ALONG MISAMIS OR-BUKIDNON-AGUSAN RD. - K1428+(-284)-K1428+(-183), K1428+725-K1429+108, MALITBOG, BUKIDNON23KC0101 · ₱40,572,000.00 · mapped
- WIDENING OF PERMANENT BRIDGE - UGUIABAN BR. (B01399MN) ALONG CDO CITY-DOMINOROG-CAMP KIBARITAN RD. (PHASE II), TALAKAG, BUKIDNON24KC0036 · ₱29,400,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL SYSTEM INCLUDING A RETARDING BASIN IN THE UPSTREAM OF KIBALAGON CREEK, MARAMAG, BUKIDNON, MUSUAN, MARAMAG, BUKIDNON21KB0121 · ₱29,400,000.00 · mapped
- WIDENING OF PERMANENT BRIDGES - BINUANGAN BR. (B00249MN) ALONG KIDAPAWAN-MAGPET-PANGAO-AN RD, KIDAPAWAN CITY, COTABATO22MC0028 · ₱25,474,501.42 · mapped
- WIDENING OF PERMANENT BRIDGE UPPER DICKLUM BR. (B01411MN) ALONG JCT. SH - MANOLO FORTICH-LIBONA-INDAHAG RD., MANOLO FORTICH, BUKIDNON23KC0050 · ₱25,235,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (MAGSAYSAY MULTI-PURPOSE COMPLEX), BARANGAY POBLACION, MAGSAYSAY, MISAMIS ORIENTAL24KK0026 · ₱24,749,879.46 · mapped
- WIDENING OF BRIDGE - MALANGAG BR. (B00268MN) ALONG PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO - BUKIDNON RD., ANTIPAS, NORTH COTABATO21MC0037 · ₱20,577,582.94 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, MAGSAYSAY, MISAMIS ORIENTAL23KK0050 · ₱19,800,000.00 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BUKIDNON-DAVAO CITY ROAD, K1597+120-K1597+180, PALACAPAO & SINUDA, QUEZON, BUKIDNON21KB0193 · ₱19,600,000.00 · mapped
- WIDENING OF BRIDGE - DOMINOROG BR. (B01094MN) ALONG BARANDIAS - DOMINOROG RD., TALAKAG, BUKIDNON21KC0092 · ₱18,463,200.00 · mapped
- CLUSTER V - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, 1) PULANGI BRIDGE (BO039MN), 2) MASIMAG BRIDGE (BO1416MN) 3) UKITAN BRIDGE (B01448MN), 4) APOLANG BRIDGE (B01446MN), 5) DILAPA BRIDGE (B01381MN) AND 6) SIMOD BRIDGE (B01386MN)19KB0036 · ₱12,159,559.68 · mapped
- CONCRETING OF MAMBING FMR PHASE II, BRGY. MAMBING, NEW CORELLA, DAVAO DEL NORTE23LC0076 · ₱11,938,731.65 · mapped
- Construction of Flood Mitigation Structure along Cagayan de Oro City-Dominorog-Camp Kibaritan Rd (Upstream and Downstream) of Uguiban Bridge, Talakag, Bukidnon23KC0060 · ₱11,760,000.00 · mapped
- REHABILITATION OF ROAD FROM PUBLIC TERMINAL TO MOLITA BUILDING, PANGANTUCAN, BUKIDNON22KC0081 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF ROAD, SITIO BASAK-SITIO NAPUTBONGBONG, STO. NIÑO, TALAINGOD, DAVAO DEL NORTE24LC0070 · ₱9,897,739.82 · mapped
- RETROFITTING/STRENGTHENING OF MANAT BR. (B01528MN) ALONG NABUNTURAN-MARAGUSAN RD., NABUNTURAN, DAVAO DE ORO21LA0056 · ₱9,703,463.74 · mapped
- CONSTRUCTION OF ROAD, PUROK DARA, BARANGAY VISAYAN, TAGUM CITY, DAVAO DEL NORTE24LC0101 · ₱9,649,567.65 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- PAGMAM-AN BR. (B01755MN) ALONG JCT. LINGIG-TRENTO RD19NI0043 · ₱9,642,984.58 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BUKIDNON-DAVAO CITY ROAD, K1566+563-K1566+971, QUEZON, BUKIDNON24KB0058 · ₱8,612,619.92 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- JOHN BOSCO BR. (B00767MN) ALONG SURIGAO-DAVAO COASTAL RD19NI0045 · ₱7,180,719.02 · mapped
- CLUSTER III-REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES IN SULOP, DAVAO DEL SUR: 1. REHABILITATION OF WATER STORAGE TANK IN BRGY. BALASINON; 2. REHABILITATION OF WATER STORAGE TANK IN BRGY. MCKINLEY; 3. REHABILITATION OF WATER S20LD0134 · ₱6,623,979.89 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- BIGAAN STEEL BR. (B00759MN) ALONG SURIGAO-DAVAO COASTAL RD19NI0046 · ₱5,520,583.42 · mapped
- RETROFITTING/STRENGTHENING OF BRIDGE - LAPINIGAN BR. (B00204MN) ALONG SURIGAO-DAVAO COASTAL RD., MABINI, DAVAO DE ORO22LA0019 · ₱5,390,000.00 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - SIMOD BR. (B01386MN) ALONG BUKIDNON-DAVAO CITY RD., SINUDA, KITAOTAO, BUKIDNON24KB0017 · ₱5,078,453.96 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY KAUYONAN, KITAOTAO, BUKIDNON22KB0131 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY MALOBALO, KITAOTAO, BUKIDNON22KB0133 · ₱4,950,000.00 · mapped
- IMPROVEMENT OF ROAD, SITIO BALOGO BARANGAY LANGCATAON, PANGANTUCAN, BUKIDNON22KC0076 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN SITIO MALINAWON, BRGY. LA FILIPINA, TAGUM CITY, DAVAO DEL NORTE24LC0079 · ₱4,949,975.25 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY CAMAYAHAN, BUTUAN CITY, AGUSAN DEL NORTE25ND0077 · ₱4,945,793.87 · mapped
- CONSTRUCTION OF ROAD, PUROK 2, BARANGAY SAN ROQUE, DON CARLOS, BUKIDNON23KB0102 · ₱4,942,517.42 · mapped
- CONSTRUCTION OF ROAD, BARANGAY LOREGA, KITAOTAO, BUKIDNON23KB0028 · ₱4,941,807.79 · mapped
- REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY CAMAYAHAN, BUTUAN CITY, AGUSAN DEL NORTE24ND0022 · ₱4,929,318.81 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY POBLACION, LAS NIEVES, AGUSAN DEL NORTE22ND0068 · ₱4,919,633.92 · mapped
- RETROFITTING/STRENGTHENING OF NABUNTURAN BR. (B00075MN) ALONG DAANG MAHARLIKA (MN), NABUNTURAN, DAVAO DE ORO21LA0057 · ₱4,321,930.28 · mapped
- RETROFITTING/STRENGTHENING OF BRIDGE - CANIDKID BR. (B01284MN) ALONG MONTEVISTA - DNAS RD, MONTEVISTA COMPOSTELA VALLEY PROVINCE20LA0101 · ₱3,082,093.84 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BAYLO, MONKAYO, DAVAO DE ORO21LA0009 · ₱2,969,795.24 · mapped
- RETROFITTING / STRENGTHENING OF BRIDGE - LINGAWAN BR (B00456MN) ALONG DIPOLOG -SINDANGAN - LILOY ROAD20JB0027 · ₱2,625,271.29 · mapped
- RETROFITTING/STRENGTHENING OF LIBASAN BR. (B00194MN) ALONG NABUNTURAN-MAINIT PARK RD., NABUNTURAN, DAVAO DE ORO21LA0048 · ₱2,479,938.49 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, LAS NIEVES, AGUSAN DEL NORTE24ND0014 · ₱2,405,263.37 · mapped
- RETROFITTING / STRENGTHENING OF BRIDGE - BALOK BR (B00137MN) ALONG SINDANGAN - SIAYAN - DUMINGAG - MAHAYAG ROAD (SINDANGAN-SIAYAN SECTION), ZAMBOANGA DEL NORTE.20JB0026 · ₱2,397,267.20 · mapped
- RETROFITTING / STRENGTHENING OF BRIDGE - DISAKAN BR (B00444MN) ALONG DIPOLOG -SINDAGAN - LILOY ROAD20JB0028 · ₱2,202,550.08 · mapped
- REHABILITATION/MAJOR REPAIR OF BRIDGES - KUYA BR. (B01436MN) ALONG MARAMAG-MARADUGAO RD., KUYA, MARAMAG, BUKIDNON24KB0009 · ₱1,960,000.00 · mapped
- RETROFITIING / STRENGTHENING OF BRIDGE - LAPUTAY BR (B00451MN) ALONG DIPOLOG - SINDANGAN - LILOY ROAD20JB0029 · ₱1,617,065.12 · mapped
- REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - PIANGON BR. (B00442MN) ALONG DIPOLOG - SINDANGAN - LILOY ROAD19JB0154 · ₱1,317,389.81 · mapped
- REHABILITATION / MAJOR REPAIR OF BRIDGE - MOTIBOT BR. (B00448MN) ALONG DIPOLOG - SINDANGAN - LILOY ROAD19JB0153 · ₱1,110,310.72 · mapped
- REHABILITATION / MAJOR REPAIR OF BRIDGE - MANAWAN BR. (B00447MN) ALONG DIPOLOG - SINDANGAN - LILOY ROAD19JB0151 · ₱1,007,792.53 · mapped
- REHABILITATION / MAJOR REPAIR OF BRIDGE - SIARE BR. (CANTILEVER) (B00453MN) ALONG DIPOLOG - SINDANGAN - LILOY ROAD19JB0155 · ₱998,036.35 · mapped
Across government
- DPWH Infrastructure: 60 awards · ₱637,419,721.78
- Province of South Cotabato Infrastructure: 19 awards · ₱179,841,077.37
- DepEd Infrastructure: 3 awards · ₱11,957,038.38
- City of Kidapawan Infrastructure: 1 award · ₱4,999,057.64
- Municipality of Prosperidad, Agusan Del Sur Infrastructure: 1 award · ₱1,999,000.08
- TESDA Goods & services: 1 award · ₱377,790.50
- 24LC0101 Construction of Road, Purok Dara,₱9,638,673.55· 2025-03-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DEL NORTE DE
- bridge₱35,364,884.48· 2025-02-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BUKIDNON 2ND DEO
- BEFF 2024 Repair of 6 Classrooms School Building P
- BEFF 2024 Repair of 7 Classrooms School Building P
- Provision of Repair and Rehabilitation of Two (2)
- 24ND0014₱2,405,263.37· 2024-07-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BUTUAN CITY DEO
- 24LC0079 Construction of Multi-Purpose Building₱4,945,927.12· 2024-07-02· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DEL NORTE DE
- Construction Project
- Construction Project
- Construction Project
- 24LC0070 Construction of Road,₱9,897,739.82· 2024-03-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DEL NORTE DE
- PB2024-02-019I
- 24KK0026₱24,705,786.29· 2024-02-29· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MISAMIS ORIENTAL 1
- Road₱8,612,619.92· 2024-02-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BUKIDNON 2ND DEO
- Construction Project
- 23K00353
- 24ND0022₱4,929,318.81· 2024-02-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BUTUAN CITY DEO
- 24KC0036₱29,266,373.69· 2024-02-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BUKIDNON 3RD DEO
- 24KC0044₱46,943,199.41· 2024-01-30· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BUKIDNON 3RD DEO
- Bridge₱1,957,404.31· 2024-01-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BUKIDNON 2ND DEO
- Bridge₱5,078,453.96· 2024-01-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BUKIDNON 2ND DEO
- 23K00352
- 23LC0100 Repair and Maintenance of National Roads₱1,543,075.40· 2023-12-28· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DEL NORTE DE
- 23LC0099 Repair and Maintenance of National Roads₱1,533,883.18· 2023-12-28· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - DAVAO DEL NORTE DE
- Construction Project
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
