Buildings and Facilities19DJ0115

CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM ACADEMIC SCHOOL BUILDING AT LUCENA CITY NHS-MAYAO PARADA EXTENSION, LUCENA CITY, QUEZON

CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM ACADEMIC SCHOOL BUILDING AT LUCENA CITY NHS-MAYAO PARADA EXTENSION, LUCENA CITY, QUEZON is a DPWH-tracked public work in Quezon 2nd DEO, Region IV-A. Reported contract value: ₱11,730,133.50. Status: Reported complete (DPWH). Contractor on record: JANMING CONST AND SUPPLIES. Figures trace to dpwh.

Quezon 2nd DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-B-19-0004171 · ₱46,809,683 · release to the district office, not itemized per project

    Possible match · score 0.79

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19DJ0115 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-10 → 2023-08-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM ACADEMIC SCHOOL BUILDING AT LUCENA CITY NHS-MAYAO PARADA EXTENSION, LUCENA CITY, QUEZON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-B-19-0004171

₱46,809,683.00 · FY2019

Released to Jose R. Reyes Memorial Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

9 projects · ₱118.2M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF SEAWALL, BRGY. TALAO-TALAO, LUCENA CITY, QUEZON

Quezon 2nd DEO, Region IV-A

2022₱24.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM ACADEMIC SCHOOL BUILDING AT CAMP NAKAR ELEMENTARY SCHOOL, LUCENA CITY

Quezon 2nd DEO, Region IV-A

2020₱23.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF THREE (3) STOREY SIX (6) CLASSROOMS ACADEMIC SCHOOL BUILDING AT GULANG-GULANG NATIONAL HIGH SCHOOL, BOCOHAN EXTENSION, LUCENA CITY, QUEZON

Quezon 2nd DEO, Region IV-A

2017₱16.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BRGY. MAMALA, SARIAYA, QUEZON

Quezon 2nd DEO, Region IV-A

2022₱14.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM ACADEMIC SCHOOL BUILDING AT ANASTACIA ELEMENTARY SCHOOL, TIAONG, QUEZON

Quezon 2nd DEO, Region IV-A

2018₱11.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, ILAYANG TALIM, LUCENA CITY, QUEZON

Quezon 2nd DEO, Region IV-A

2022₱9.9M
Reported complete (DPWH)
View all 9 projects →

4. Implementation

Contract Amount

₱11,730,133.50

Progress

Reported complete (DPWH)

Start Date

October 23, 2019

Target End

July 18, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)City of Lucenaa/Mayao Parada
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.