Buildings and Facilities20BD0126

CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM, CAPATAN ELEMENTARY SCHOOL, TUGUEGARAO CITY, CAGAYAN

CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM, CAPATAN ELEMENTARY SCHOOL, TUGUEGARAO CITY, CAGAYAN is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱17,802,679.14. Status: Reported complete (DPWH). Contractor on record: TOP VISION DESIGN AND CONST SERVICES. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱62,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱17,802,679 · TOP VISION DESIGN AND CONSTRUCTION SERVICES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-04 → 2025-09-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱2,225,335 per classroom= 1.7x the Region II median (n=370)

Contract cost ₱17,802,679 ÷ 8 classroom read from the DPWH title (“EIGHT (8) CLASSROOM”; classroom count in title). National percentile: 68. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM, CAPATAN ELEMENTARY SCHOOL, TUGUEGARAO CITY, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱62,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Natappian Flood Control System, Sta. 0+930 - Sta. 1+130, Solana, Cagayan (Downstream)
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Cagayan 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM

₱17,802,679.14 · TOP VISION DESIGN AND CONSTRUCTION SERVICES

Award / contract ref: 20BD0126

Contractor

C

12 projects · ₱49.5M total · 0 flags

4. Implementation

Contract Amount

₱17,802,679.14

Progress

Reported complete (DPWH)

Start Date

August 24, 2020

Target End

March 21, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanTuguegarao CityLarion Bajo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.