GAA 2017 MFO-117M00025

ROAD WIDENING OF DIGOS-MAKAR ROAD, K1598+778 K1601+545; K1601+566 K1601+694; K1602+08 -K1605+376, MALUNGON, SARANGANI

ROAD WIDENING OF DIGOS-MAKAR ROAD, K1598+778 K1601+545; K1601+566 K1601+694; K1602+08 -K1605+376, MALUNGON, SARANGANI is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱173,377,736.51. Status: Reported complete (DPWH). Contractor on record: WCS CONST INC. Figures trace to dpwh.

Region XII, Region XII
Region: Region XII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱165,799,305 · WCS CONSTRUCTION, .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-06-29 → 2025-11-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD WIDENING OF DIGOS-MAKAR ROAD, K1598+778  K1601+545; K1601+566  K1601+694; K1602+08 -K1605+376, MALUNGON, SARANGANI

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Project

₱165,799,305.48 · WCS CONSTRUCTION, .

Contractor

D

49 projects · ₱4.1B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR-ALBAY DIVERSION ROAD, PACKAGE 2, ALBAY, OAS, ALBAY(3RD LEGISLATIVE DISTRICT)

Region V, Region V

2023₱214.2M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF BY-PASSES/DIVERSION ROADS INCLUDING ROW, CAMARINES SUR-ALBAY DIVERSION ROAD, LIGAO CITY, ALBAY 3RD LD

Region V, Region V

2016₱193.0M
Reported complete (DPWH)

BICOL RIVER BASIN WATERSHED MANAGEMENT PROJECT (FLOOD MITIGATION COMPONENT) - GUINOBATAN AND LIGAO FLOOD CONTROL, ALBAY 3RD LD

Region V, Region V

2016₱193.0M
Reported complete (DPWH)
No sat.

PREVENTIVE MAINTENANCE-ASPHALT OVERLAY OF LIBON-PANTAO-PIODURAN ROAD SECTION ALONG ALBAY WEST COAST ROAD, LIBON, ALBAY PROVINCE

Roads Management Cluster I (Bilateral), Central Office

2017₱189.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE, BRGY. BASAG, LIGAO C

Region V, Region V

2024₱187.6M
Past target date (DPWH On-Going)

OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL DIKES IN GUINOBATAN, ALBAY FOR CRITICAL SECTIONS OF

Region V, Region V

2018₱144.7M
Reported complete (DPWH)
View all 49 projects →

4. Implementation

Contract Amount

₱173,377,736.51

Progress

Reported complete (DPWH)

Start Date

April 21, 2017

Target End

March 28, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)SaranganiMalungonJ.P. Laurel
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.