Buildings and Facilities17PB0068No coordinates published by DPWH

CY 2017 BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF CLASSROOMS BATCH 13, CONSTRUCTION OF 2STY - 4CL LENNENG ES

CY 2017 BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF CLASSROOMS BATCH 13, CONSTRUCTION OF 2STY - 4CL LENNENG ES is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱9,702,220.65. Status: Reported complete (DPWH). Contractor on record: CAMIA CONST DEVELOPMENT CORP FORMERLY:CAM. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Cordillera Administrative Region

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0006775 · ₱318,930 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱9,702,221 · CAMIA CONST. DEVELOPMENT

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CY 2017 BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF CLASSROOMS BATCH 13, CONSTRUCTION OF 2STY - 4CL LENNENG ES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0006775

₱318,930.00 · FY2017

Released to MacArthur National S Agricultural School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Project

₱9,702,220.65 · CAMIA CONST. DEVELOPMENT

Award / contract ref: 17PB0068

Contractor

C

60 projects · ₱1.7B total · 0 flags

Other projects by this contractor

No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) AYAGA - STA. MARCELA - FLORA - LASAM ROAD, CHAINAGE 12937 - CHAINAGE 14620, CHAINAGE 14694 - CHAINANGE 180

Cordillera Administrative Region, Cordillera Administrative Region

2017₱144.8M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) - TERTIARY ROADS APAYAO ILOCOS NORTE ROADS, K0626+301 - K0628+801

Apayao 1st DEO, Cordillera Administrative Region

2017₱96.5M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) AYAGA-STA. MARCELA-FLORA-LASAM ROAD (22619-23768)-(23777-24448)-(24489-26002), APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2018₱93.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS - (3 UNITS - FOUR (4) STOREY SIXTEEN (16) CL SCHOOL BUILDING) (BUILDING -A, BUILDING-B AND BUILDING-C), CAGAYAN NATIONAL HIGH SCHOOL, TUGUEGARAO CITY

Cagayan 3rd DEO, Region II

2016₱79.1M
Reported complete (DPWH)
No sat.

LOCAL PROG. - LOCAL ROADS & BRIDGES - LOCAL ROADS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IGUIG BYPASS ROAD (MANAOAG BRIDGE), IGUIG, CAGAYAN

Cagayan 3rd DEO, Region II

2021₱67.5M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) CLAVERIA-CALANASAN-KABUGAO ROAD, KO673+234-K0674+303, CALANASAN, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2018₱59.0M
Reported complete (DPWH)
View all 60 projects →

4. Implementation

Contract Amount

₱9,702,220.65

Progress

Reported complete (DPWH)

Start Date

January 2, 2018

Target End

July 12, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)Apayao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.