Roads24FB0070

SIPAG: ACCESS ROADS AND/OR BRIDGES FROM THE NATONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SALVACION-LACAG-QUITUINAN ROAD AT BARANGAY SALVACION AND LACAG, DARAGA, ALBAY

SIPAG: ACCESS ROADS AND/OR BRIDGES FROM THE NATONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SALVACION-LACAG-QUITUINAN ROAD AT BARANGAY SALVACION AND LACAG, DARAGA, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱96,496,990.30. Status: Past target date (DPWH On-Going). Contractor on record: FIRST OMB CONST AND DEVELOPMENT CORP 46481. Figures trace to dpwh.

Albay 2nd DEO, Region V
Region: Region V

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱38,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Barangay Namantao, Daraga, Albay
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Albay 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 46481

35 projects · ₱1.5B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-INSTALLATION OF STREETLIGHTS FOR THE ILLUMINATION VARIOUS ROADS NETWORKS/BARANGAYS IN LEGAZPI CITY AND DARAGA ALBAY (BONOT-BOGTONG-BOUNDARY TAGA

Region V, Region V

2024₱215.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF ROAD, UPPER STA. CRUZ, RAGAY, CAMARINES SUR

Camarines Sur 1st DEO, Region V

2025₱137.4M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF ROAD, F. SIMEON, RAGAY, CAMARINES SUR

Camarines Sur 1st DEO, Region V

2025₱136.9M
Past target date (DPWH On-Going)
No sat.

SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY PADANG (UPSTREAM SECTION), LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2024₱96.5M
Past target date (DPWH On-Going)
No sat.

CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF PADANG ROAD, LEGAZPI CITY, ALBAY

Albay 2nd DEO, Region V

2024₱93.6M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS - FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF DIKE AND GROUNDSILL STRUCTURE ALONG YAWA RIVER, PACKAGE 1, PAWA-BOGTONG SECTION,

Albay 2nd DEO, Region V

2024₱74.9M
Past target date (DPWH On-Going)
View all 35 projects →

4. Implementation

Contract Amount

₱96,496,990.30

Progress

Past target date (DPWH On-Going)

Start Date

April 8, 2024

Target End

April 1, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.