GAA 2025 OO-125GO0012

OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF SIDEWALK - BACOLOD-SN CARLOS RD - K0012 + 000 - K0013 + 580

OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF SIDEWALK - BACOLOD-SN CARLOS RD - K0012 + 000 - K0013 + 580 is a DPWH-tracked public work in Bacolod City DEO, Negros Island Region. Reported contract value: ₱26,896,921.94. Status: Past target date (DPWH On-Going). Contractor on record: M K U CONST AND SUPPLY. Figures trace to dpwh.

Bacolod City DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25GO0012 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    95% reported · imagery 2019-04-01 → 2025-06-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱17,023,368 per km= 1.0x the Negros Island Region median (n=55)

Contract cost ₱26,896,922 ÷ 1.58 km read from the DPWH title (“K0012 + 000 - K0013 + 580”; K-post / station range length). National percentile: 28. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF SIDEWALK - BACOLOD-SN CARLOS RD - K0012 + 000 - K0013 + 580

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction Flood Control Structures at Villa Angela, from Bacolod City Boundary Rd to Lupit River, Bacolod City
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Bacolod City DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

77 projects · ₱1.0B total · 1 flags

4. Implementation

Contract Amount

₱26,896,921.94

Progress

Past target date (DPWH On-Going)

Start Date

February 14, 2025

Target End

December 16, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)City of BacolodMansilingan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.