DEVELOPMENT OF SITES AND CONSTRUCTION OF EVACUATION CENTERS IN REGION V, PAGSANGAHAN, BASUD, CAMARINES NORTE

DEVELOPMENT OF SITES AND CONSTRUCTION OF EVACUATION CENTERS IN REGION V, PAGSANGAHAN, BASUD, CAMARINES NORTE is a DPWH-tracked public work in Region V, Region V. Reported contract value: ₱34,858,513.17. Status: Past target date (DPWH On-Going). Contractor on record: ALXM CONSTRUCTION. Figures trace to dpwh.

Region V, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19F00101 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    0% reported · imagery 2015-04-29 → 2025-04-17

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: DEVELOPMENT OF SITES AND CONSTRUCTION OF EVACUATION CENTERS IN REGION V, PAGSANGAHAN, BASUD, CAMARINES NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

31 projects · ₱923.3M total · 0 flags

Other projects by this contractor

No sat.

CLUSTER I - FY 2023 : ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM (1) ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROAD ALBAY WEST COAST RD - K0490+700 - K0491+140 AND K0492+000

Albay 3rd DEO, Region V

2023₱61.0M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORE PROTECTION STRUCTURE, BARANGAY TERRAPLIN, SAN PASCUAL, MASBATE.

Masbate 1st DEO, Region V

2025₱47.5M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF SHORE PROTECTION STRUCTURE,BARANGAY DANAO, BATUAN, MASBATE.

Masbate 1st DEO, Region V

2025₱47.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF BUSAC/GMA (ALBAY CAMARINES SUR DIVERSION ROAD) BARANGAY BUSAC TO ALBAY/CAMSUR DIVERSION ROAD, ALBAY

Albay 3rd DEO, Region V

2022₱47.2M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - SN FERNANDO NORTH RD- K0022+081- K0022+230, K0022+284 - K0023+000, K0024+000 - K0024+121, K0024+384 - K0024+434.

Masbate 1st DEO, Region V

2025₱44.5M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS- SECONDARY ROADS- SN FERNANDO NORTH RD - K0026+464 - K0026+1000, K0027+001.70 - K0027+544.10.

Masbate 1st DEO, Region V

2025₱42.8M
Past target date (DPWH On-Going)
View all 31 projects →

4. Implementation

Contract Amount

₱34,858,513.17

Progress

Past target date (DPWH On-Going)

Start Date

January 16, 2020

Target End

May 23, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines NorteBasudMantugawe
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.