Buildings and Facilities20FB0162

CONSTRUCTION/ESTABLISHMENT OF THREE STOREY WITH ROOF DECK PMS - OP INTEGRATED OPERATIONS AND SERVICE CONTINUITY BUILDING WITH CARPORT, POWERHOUSE, SITE DEVELOPMENT INCLUDING SOLAR PANELS AND LANDSCAPING, LEGAZPI CITY

CONSTRUCTION/ESTABLISHMENT OF THREE STOREY WITH ROOF DECK PMS - OP INTEGRATED OPERATIONS AND SERVICE CONTINUITY BUILDING WITH CARPORT, POWERHOUSE, SITE DEVELOPMENT INCLUDING SOLAR PANELS AND LANDSCAPING, LEGAZPI CITY is a DPWH-tracked public work in Region V, Region V. Reported contract value: ₱58,075,869.70. Status: Past target date (DPWH On-Going). Contractor on record: HI-TONE CONST. Figures trace to dpwh.

Region V, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱58,075,870 · HI-TONE CONSTRUCTION & DEVELOPMENT

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    94% reported · imagery 2019-12-29 → 2023-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/ESTABLISHMENT OF THREE STOREY WITH ROOF DECK PMS - OP INTEGRATED OPERATIONS AND SERVICE CONTINUITY BUILDING WITH CARPORT, POWERHOUSE, SITE DEVELOPMENT INCLUDING SOLAR PANELS AND LANDSCAPING, LEGAZPI CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2020 GAA. DBM GAA FY2020

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of PMS-OP Building

₱58,075,869.70 · HI-TONE CONSTRUCTION & DEVELOPMENT

Award / contract ref: 20FB0162

Contractor

C

555 projects · ₱31.0B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD/SEAWALL, BARANGAY POBLACION, RAPU-RAPU, ALBAY (PHASE 3) RAPU-RAPU, A

Region V, Region V

2023₱236.8M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, MASBATE CITY

Masbate 2nd DEO, Region V

2024₱198.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, DSWD HAVEN FOR DISTRESSED WOMEN, CHILDREN AND, HOME FOR THE AGED AT BARANG

Region V, Region V

2024₱192.1M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-NATIONAL BUILDING PROGRAM-CONSTRUCTION OF 5-STOREY OPD, AMBULATORY AND SPECIALTY CENTER, BICOL REGIONAL TRAINING AND TEACHING HOSPITAL (BRTTH), DARAGA, ALBAY-PHASE 1,DARAGA, ALBAY 2ND L

Region V, Region V

2022₱187.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STO. DOMINGO, VIRAC, CATANDUANES, VI

Region V, Region V

2024₱187.5M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION OF DPWH REGIONAL OFFICE V BUILDING, RES COMPOUND, LEGAZPI CITY, ALBAY (PHASE 5), RES COMPOUND,LEGAZPI CITY, ALBAY(2ND LEGISLATIVE DISTRICT)

Region V, Region V

2023₱187.4M
Past target date (DPWH On-Going)
View all 555 projects →

4. Implementation

Contract Amount

₱58,075,869.70

Progress

Past target date (DPWH On-Going)

Start Date

September 16, 2020

Target End

June 12, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of LegazpiBgy. 40 - Cruzada
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.