Roads18EB0012

ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS, MINDORO WEST COASTAL RD - K0335 + 500 - K0337 + 200, K0348 + 250 - K0349 + 000, K0396 + 000 - K0397 + 635 (S00095MR)SABLAYAN, OCCIDE

ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS, MINDORO WEST COASTAL RD - K0335 + 500 - K0337 + 200, K0348 + 250 - K0349 + 000, K0396 + 000 - K0397 + 635 (S00095MR)SABLAYAN, OCCIDE is a DPWH-tracked public work in Mindoro Occidental DEO, Region IV-B. Reported contract value: ₱47,816,755.54. Status: Reported complete (DPWH). Contractor on record: CAVACON CORP FORMERLY CAGAYAN VALLEY CONST. Figures trace to dpwh.

Mindoro Occidental DEO, Region IV-B
Region: Region IV-B

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-E-18-0018857 · ₱8,639,025 · release to the district office, not itemized per project

    Possible match · score 0.80

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18EB0012 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-11-06 → 2023-10-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS, MINDORO WEST COASTAL RD - K0335 + 500 - K0337 + 200, K0348 + 250 - K0349 + 000, K0396 + 000 - K0397 + 635 (S00095MR)SABLAYAN, OCCIDE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Patrick River (Pag-asa Section), Sablayan, Occidental Mindoro
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-18-0018857

₱8,639,025.00 · FY2018

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

56 projects · ₱4.2B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF BALER BYPASS ROAD, BALER, AURORA

Region III, Region III

2021₱263.0M
Reported complete (DPWH)
No sat.

WIDENING OF GENERAL SANTOS AVENUE, BRGY. LOWER BICUTAN TO BRGY. CENTRAL BICUTAN, TAGUIG CITY

National Capital Region, National Capital Region

2020₱232.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, PROVINCE OF AURORA

Region III, Region III

2022₱193.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS-TO DECLARED TOURISM DESTINATIONS-CONCRETING OF ROAD FROM CASIGURAN TOWN PROPER LEADING TO CASAPSAPAN BAY & CASAPSAPAN TO DINIOG ROAD, PROVINCE OF AURO

Region III, Region III

2016₱193.0M
Reported complete (DPWH)
No sat.

CONVERGENCE ANS SPECIAL SUPPORT PROGRAM-BASIC INFRA PROGRAM-ACCESS ROADS AND/OR BRIDGES FR. THE NAT'L. ROAD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF DOÑA REMEDIOS TRINIDAD-DINGALAN ROAD, AURORA SECTION (PHASE 2), PROV. OF AURORA

Region III, Region III

2023₱192.3M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS-CONSTRUCTION OF BALER BYPASS ROAD, BALER, AURORA

Region III, Region III

2023₱173.7M
Reported complete (100% progress, DPWH status On-Going)
View all 56 projects →

4. Implementation

Contract Amount

₱47,816,755.54

Progress

Reported complete (DPWH)

Start Date

May 7, 2018

Target End

February 10, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOccidental MindoroMamburaoFatima
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.