Bridges22A00056

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF BARONG BRIDGE CONNECTING ILOCOS NORTE-ABRA ROAD TO THE FIVE BARANGAYS OF DINGRAS, ILOCOS NORTE

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF BARONG BRIDGE CONNECTING ILOCOS NORTE-ABRA ROAD TO THE FIVE BARANGAYS OF DINGRAS, ILOCOS NORTE is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱24,124,954.20. Status: Reported complete (DPWH). Contractor on record: A B TAYLAN CONST. Figures trace to dpwh.

Region I, Region I
Region: Region I

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22A00056 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-09-07 → 2025-10-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF BARONG BRIDGE CONNECTING ILOCOS NORTE-ABRA ROAD TO THE FIVE BARANGAYS OF DINGRAS, ILOCOS NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2022 GAA. DBM GAA FY2022

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

98 projects · ₱4.4B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (LAOAG CITY-BACARRA SECTION), ILOCOS NORTE

Region I, Region I

2024₱238.8M
Past target date (DPWH On-Going)
No sat.

ROAD WIDENING - PRIMARY ROADS - MANILA NORTH ROAD - K0490+504-K0491+278; K0492+800-K0493+019; K0493+050-K0493+216; K0505+656-K0507+368; K0521+000-K0522+400; K0527+459-K0529+407; K0531+363-K0531+921; K0532+981-K0534+359

Region I, Region I

2018₱187.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, IMPROVEMENT/CONCRETING OF PAOAY LAKE CIRCUMFERENTIAL ROAD AND MALACANANG TI AMIANAN, PAOAY, ILOCOS NORTE

Region I, Region I

2017₱178.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - PAOAY-LAOAG INTERNATIONAL AIRPORT ACCESS ROAD, PAOAY, ILOCOS NORTE

Region I, Region I

2025₱156.0M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG N1 (S00034LZ), MANILA NORTH ROAD, K0494 + 396 - K0495 + 024; K0496 + 164 - K0496 + 423; K0496 + 775 - K0497 + 444; K0497 + 834 - K0498 + 000; K0499 + 200 - K0500 + 676; K0500+676 - K0500 +698(L/S); K0500 +676 -

Region I, Region I

2016₱146.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), PAOAY-LAOAG INTERNATIONAL AIRPORT ACCESS ROAD, PAOAY, ILOCOS NORTE

Region I, Region I

2024₱145.1M
Past target date (DPWH On-Going)
View all 98 projects →

4. Implementation

Contract Amount

₱24,124,954.20

Progress

Reported complete (DPWH)

Start Date

March 4, 2022

Target End

August 30, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)Ilocos NorteDingrasParado
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.