Construction of Flood Mitigation Structure24JD0008

Construction of Flood Control Structure along Palandok River (Downstream) Sta. 0+000.00 - Sta. 0+400.00, Leon Postigo, Zamboanga del Norte

Construction of Flood Control Structure along Palandok River (Downstream) Sta. 0+000.00 - Sta. 0+400.00, Leon Postigo, Zamboanga del Norte is a DPWH-tracked public work in LEON T. POSTIGO (ZAMBOANGA DEL NORTE), ZAMBOANGA DEL NORTE, Region IX. Reported contract value: ₱96,500,000.00. Status: Reported complete (DPWH). Contractor on record: F A TORRES CONST / R B MORALLO CONST. Figures trace to sumbong.

LEON T. POSTIGO (ZAMBOANGA DEL NORTE), ZAMBOANGA DEL NORTE, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱15,000

    Probable match · score 0.93

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIX-24-0003725 · ₱2,468,519

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24JD0008 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-12-15 → 2025-03-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱241,250 per linear m= 2.3x the Region IX median (n=26)

Contract cost ₱96,500,000 ÷ 400 linear m read from the DPWH title (“Sta. 0+000.00 - Sta. 0+400.00”; station range length (Sta. a+b to c+d)). National percentile: 82. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Zamboanga del Norte

Based on the coordinates published with the DPWH record and NOAH file ZamboangaDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Flood Control Structure along Palandok River (Downstream) Sta. 0+000.00 - Sta. 0+400.00, Leon Postigo, Zamboanga del Norte

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 93%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structure along Talinga River ( Upstream ) , Talinga, Leon B. Postigo, Zamboanga del Norte
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIX-24-0003725

₱2,468,519.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIX-24-0007625

₱1,296,481.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIX-24-0003726

₱193,302.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIX-24-0007627

₱119,751.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

1 projects · ₱96.5M total · 0 flags

4. Implementation

Contract Amount

₱96,500,000.00

Progress

Reported complete (DPWH)

Start Date

March 24, 2024

Target End

February 18, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga del NorteLeon T. PostigoRizon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.