Flood Control and Drainage16OI0007

CONST./REHAB. OF FLOOD CONTROL STRUCTURE ALONG ZAPOTE RIVER FROM BRGY. TALON 2 TO BRGY. TALON 5 (PHA

CONST./REHAB. OF FLOOD CONTROL STRUCTURE ALONG ZAPOTE RIVER FROM BRGY. TALON 2 TO BRGY. TALON 5 (PHA is a DPWH-tracked public work in Las Piñas-Muntinlupa DEO, National Capital Region. Reported contract value: ₱35,369,759.63. Status: Reported complete (DPWH). Contractor on record: MRRM TRADING. Figures trace to dpwh.

Las Piñas-Muntinlupa DEO, National Capital Region
Region: National Capital Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

GAA FY2016 not yet loaded (source: DBM GAA)

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

79 projects · ₱2.9B total · 0 flags

Other projects by this contractor

SUSTAINABLE INFRASTRURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), BARANGAY MALIGAYA, SAN MIGUEL, BULACAN

Region III, Region III

2024₱96.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG ZAPOTE RIVER, BRGY.

Region IV-A, Region IV-A

2018₱92.6M
Reported complete (DPWH)
No sat.

REHABILITATION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE ALONG ACCESS ROAD MALBOG JCT. - STA. FE GUINBIRAYAN PROVINCIAL ROAD LEADING TO SAN JOSE BEACHES, STA. 07+486.20 - STA. 07+634.80, STA. FE, ROMBLON

Romblon DEO, Region IV-B

2022₱86.8M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ODIONGAN-EAST-WEST RD, K0008+940 - K0008+986, TABLAS ISLAND, ROMBLON

Romblon DEO, Region IV-B

2022₱86.8M
Reported complete (DPWH)
No sat.

CONST. OF TWO (2) UNITS FOUR (4) STOREY, SIXTEEN (16) CLASSROOM S/B AT PEDRO E. DIAZ, H/S, MUNTINLUP

Las Piñas-Muntinlupa DEO, National Capital Region

2018₱78.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SUGOD-CAWAYAN ROAD LEADING TO BLUE HOLES, STA. 11+100.00 - STA. 11+200.00, STA. 11+510.00 - STA. 11+548.30, SAN AGUSTIN, ROMBLON

Romblon DEO, Region IV-B

2022₱77.2M
Reported complete (DPWH)
View all 79 projects →

4. Implementation

Contract Amount

₱35,369,759.63

Progress

Reported complete (DPWH)

Start Date

March 30, 2016

Target End

November 24, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.