SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF BARONG BRIDGE CONNECTING ILOCOS NORTE-ABRA ROAD TO THE FIVE BARANGAYS OF DINGRAS, ILOCOS NORTE
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF BARONG BRIDGE CONNECTING ILOCOS NORTE-ABRA ROAD TO THE FIVE BARANGAYS OF DINGRAS, ILOCOS NORTE is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱28,370,827.93. Status: Past target date (DPWH On-Going). Contractor on record: A B TAYLAN CONST. Figures trace to dpwh.